Opportunity
SAM #N400857545551
Switchgear Replacement at MCAS Cherry Point for NAVFACSYSCOM Mid-Atlantic
Buyer
Naval Facilities Engineering Systems Command Mid-Atlantic
Posted
August 24, 2026
Respond By
September 10, 2026
Identifier
N400857545551
NAICS
238210, 236220
This opportunity from the Department of the Navy, Naval Facilities Engineering Systems Command Mid-Atlantic, focuses on replacing electrical switchgear at Marine Corps Air Station Cherry Point, NC. - Government Buyer: - Department of the Navy - Naval Facilities Engineering Systems Command, Mid-Atlantic - Marine Corps Air Station Cherry Point - Scope of Work: - Replacement of seven SF6/high-firepoint fluid insulated pad-mounted switchgear stations (15.5 kV) - Demolition and disposal of existing switchgear - Installation and reconnection to existing or new transformers - Interior distribution system components (transformers, wireways, marking strips, fuses, grounding system) - Switchboards (480Y/277 or 208Y/120 volts AC, with molded-case circuit breakers, bus bars, digital metering, heaters, grounding) - Underground electrical distribution components (precast structures, medium voltage cables, cable joints, conduit, duct sealants, cable supports, grounding) - Technical Requirements: - Compliance with IEEE, NEMA, UL, and NFPA 70 standards - Rigorous submittals, testing, and documentation - Safety, environmental, and quality control procedures - OEMs: - No specific OEMs are named; however, the switchgear and components must meet industry standards (IEEE, NEMA, UL) - Notable Requirements: - All equipment must be front accessible, stainless steel enclosed, and painted per IEEE C57.12.28 - Grounding and installation must follow detailed specifications - Strict adherence to safety and quality protocols - Quantities: - Seven switchgear units - Additional components as required for full system replacement
Description
This procurement is restricted to the General MACC contractors. Only the General MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings.