Opportunity

Hesperia Unified School District Husd #26.27-002

Solicitation for Construction and Installation of Synthetic Running Track at Hesperia High School

Posted

August 20, 2026

Respond By

August 27, 2026

Identifier

26.27-002

NAICS

238990, 237990, 238190

This opportunity from Hesperia Unified School District seeks qualified contractors for the construction and installation of an all-weather synthetic running track at Hesperia High School. - Government Buyer: - Hesperia Unified School District, Purchasing Department - OEMs and Vendors Mentioned: - Beynon Sports Surfacing (BSS 1000 system) - Advanced Polymer Technology (Rekortan track systems) - Products Requested: - Beynon BSS 1000 13mm Full Pour Dual Durometer Synthetic Track Surfacing System (World Athletics certified) - Rekortan G-13 Traditional Running Track Surface (World Athletics certified) - Ceramic wall tile (4 1/4 x 4 1/4 x 1/8 inch, semi-gloss) - Wainscot cap tile, glass wall tile accent - Asphaltic concrete paving mixes (PG 64-16 Polymer Modified) - Concrete mix for paving and flatwork (2,500 psi) - Storm drain pipe materials (cast iron, vitrified clay, reinforced concrete, PVC, polyethylene) - Turf repair materials, signage - Services Requested: - Track installation and surfacing (leveling, surfacing, installation per World Athletics and NCAA standards) - Restroom upgrades (ceramic tile installation, door hardware, painting, signage) - Storm drain installation (connection to existing catch basin) - Turf repair and irrigation modification - Site paving (concrete and asphalt removal/replacement) - Track line striping and event markings (certified per NCAA, WA, NFSHSA rules) - Unique/Notable Requirements: - Track surfacing system must be World Athletics approved, full-depth poured-in-place dual durometer synthetic system - All polyurethanes must be manufactured by ISO 9001 and ISO 14001 certified companies - Minimum five-year manufacturer's warranty for track surfacing; BSS 1000 system offers a 10-year insured warranty - Mandatory pre-bid job walk; work hours restricted to avoid school disruptions - Contractors must comply with California prevailing wage laws and DIR registration - Restroom upgrades include ceramic tile wall finishes, door hardware, and signage - Storm utility drainage piping and site paving included - Environmentally controlled storage for materials required - Multiple addenda and approved substitutions included in bid documents

Description

This solicitation is for the construction and installation of an all-weather synthetic running track at Hesperia High School, part of the Hesperia Unified School District. The project includes surfacing, leveling the existing surface, and related work as specified in the bid documents. The scope also involves coordination with the district, adherence to World Athletics and NCAA standards, and installation of a Beynon BSS 1000 13mm full pour dual durometer synthetic track surfacing system or approved equal. A mandatory pre-bid job walk is scheduled, and bidders must submit a comprehensive bid package including various certifications and forms.

View original listing