Opportunity

California eProcure #0000040089

California DGS seeks installation and commissioning of EV charging infrastructure at Teerink Pumping Plant, Kern County.

Posted

August 20, 2026

Respond By

October 06, 2026

Identifier

0000040089

NAICS

238210, 237130, 237990

This opportunity involves the installation and commissioning of Electric Vehicle Supply Equipment (EVSE) infrastructure at the John R. Teerink Pumping Plant in Kern County, California, for the Department of Water Resources. - Government Buyer: - State of California Department of General Services (DGS), Executive Office of Sustainability - California Department of Water Resources, John R. Teerink Pumping Plant - Products Requested: - Eight (8) Level 2 dual-port pedestal electric vehicle charging stations (SAE J1772 compliant, commercial grade, minimum 18 ft cable) - Two (2) Level 3 DC fast charging stations (Power Link 2000, 160kW output, SAE J3400 or SAE CCS1 compliant, commercial grade, minimum 18 ft cable) - Associated infrastructure: transformer (75 KVA, 480V-208Y/120V), panelboard (225A-3P), disconnect switches (400A and 100A, weatherproof), concrete equipment pads, digital multi-meter (NEMA-1 enclosure) - Services Requested: - Installation, wiring, testing, trenching, backfilling, surface restoration, and commissioning of EVSE and supporting electrical infrastructure - Third-party testing for new feeder conductors - 3-year network management service for networked charging stations - Unique Requirements: - All EVCS units must be commercial grade, suitable for long-term outdoor use, and compliant with UL 2594, UL 223, UL 50E, NFPA 70, FCC Part 15, and SAE standards - ADA accessibility and compliance with California Code of Regulations Title 24 - Only California certified Small Businesses with a C-10 Electrical Contractor license may bid - Contractors and subcontractors must be registered with the Department of Industrial Relations (DIR) - Compliance with California Air Resources Board In-Use Off-Road Diesel Fueled Fleet Regulations - EVCS units are provided by a state vendor; contractor is responsible for infrastructure and installation - Liquidated damages of $1,000 per day for delays - Mandatory third-party testing and field inspection - No specific OEMs or vendors for EVSE equipment are named; bidders must ensure compatibility and meet all technical and regulatory requirements.

Description

This solicitation is for the installation and electrical connection of Electric Vehicle Supply Equipment (EVSE) infrastructure at the John R. Teerink Pumping Plant in Kern County, California. The scope includes wiring, testing, trenching, backfilling, and surface restoration to support (8) Level 2 and (2) Level 3 electric vehicle charging station ports. The project requires a C-10 Electrical Contractor license and is open only to California certified Small Businesses. The estimated project cost is $334,400.00 and the project duration is 60 calendar days.

View original listing