Opportunity
Encinitas Planet bids #ENG-BID 26-04
Storm Drain Rehabilitation and Repair Project for City of Encinitas
Posted
August 19, 2026
Respond By
September 16, 2026
Identifier
ENG-BID 26-04
NAICS
237110, 237990, 238190
The City of Encinitas Engineering Department is seeking contractors for a comprehensive storm drain rehabilitation and repair project across multiple city locations. - Government Buyer: - City of Encinitas Engineering Department - Contact: Daniel S. Nutter, P.E., Director of Engineering / City Engineer - Products and Services Requested: - Installation of Cured-in-Place Pipe (CIPP) liners in various sizes and thicknesses (e.g., 20mm for 48" CMP, 8mm for 18" CMP, 10mm for 24" CMP, 12mm for 27" CMP) - Installation of HDPE Solid Wall Pipe (48-inch diameter, 70 feet total) - Pipe replacement, point repairs, lateral reconnections, and site restoration - Revegetation hydroseeding and maintenance (120-day plant establishment period) - Traffic control services, access establishment, stormwater management, and jobsite management - Odor control plan implementation for styrene-based CIPP liners near residential areas - Unique/Notable Requirements: - 50% own forces requirement for contractors - Compliance with California prevailing wage laws - Odor control plans required for CIPP installations near residences - Strict project timeline: 25 working days for base bid, up to 38 working days with alternates; liquidated damages of $3,600 per calendar day for delays - Contractors must provide their own water (via construction meter from San Dieguito Water District) - Revegetation maintenance required for 120 days post-installation - OEMs and Vendors: - No specific OEMs named; project requires specialized CIPP liner and HDPE pipe products - Quantities and Locations: - Multiple locations including Lake Drive, Neptune Ave, Pinecrest, Cerro St, Emma Dr, Genie Ln, Avocet Ct, Pariva Dr, Hurtsdale Ave, and Freda Ln - Detailed quantities for each pipe segment and liner thickness provided in attachments
Description
This solicitation is for the rehabilitation and repair of existing storm drains within the City of Encinitas that are badly corroded. The work includes installation of Cured in Place Pipe Liners (CIPP), HDPE Solid Wall Pipe Liners, and other miscellaneous items as specified in the project plans and specifications. The project requires a Class A license and involves various construction activities such as mobilization, vegetation clearing, stormwater management, traffic control, pipe installation, and revegetation. The project duration is 38 days with liquidated damages of $3,600 per calendar day. Bidders must submit electronically by September 16, 2026.