Opportunity

MyVendorLink #FKEC BID 26-15

Engineering, Procurement, and Construction of Vehicle Fuel Tank and System for FKEC

Posted

August 19, 2026

Respond By

September 02, 2026

Identifier

FKEC BID 26-15

NAICS

237120, 332420

Florida Keys Electric Cooperative Association, Inc. (FKEC) is seeking proposals for the engineering, procurement, and construction of a vehicle fuel tank and fueling system. - Government Buyer: - Florida Keys Electric Cooperative Association, Inc. (FKEC) - Located in Tavernier, Monroe County, Florida - Scope of Work: - Removal of existing above ground storage tank (AST) farm, except for a 4,000 gallon vehicle fuel tank (to remain until project completion) - Engineering, procurement, and construction of a new vehicle fuel tank and system - Final removal of the remaining vehicle fuel tank and tank farm walls, leaving only the concrete floor (no sumps) - Products/Services Requested: - Galvanized sheet iron and steel tanks - Steel tanks (pressure and storage types) - Surface and underground tanks for fuel - Automatic fueling systems, accessories, and parts - Fuel pumps (service station type) - Engineering, procurement, and construction services - Notable Requirements: - Insurance coverage required - Bid bond (5% of not to exceed bid price) - Performance bond (100% of not to exceed bid price) - Construction bond (100% of not to exceed bid price) - OEMs and Vendors: - No specific OEMs named; vendors should specialize in fuel storage and fueling systems - Commodity Codes: - NIGP codes: 830-34, 830-61, 830-69, 830-70, 720-4, 720-33 - Unique Requirements: - Removal and site preparation must leave only the concrete floor, with no sumps - Existing 4,000 gallon tank remains until project completion, then removed by FKEC

Description

Florida Keys Electric Cooperative Association, Inc. (FKEC) is soliciting proposals to engineer, procure, and construct a vehicle fuel tank and system. The project involves removing an existing tank farm of above ground storage tanks, except for the 4,000 gallon vehicle fuel tank which will remain until all services are complete. After completion, FKEC will remove the vehicle fuel tank and tank farm walls, leaving the concrete floor with no remaining sumps. The solicitation requires insurance, bid bond, performance bond, and construction bond, each with specified amounts based on the not to exceed bid price.

View original listing