Opportunity

Quebec SEAO #24174-S

Fabrication of Aluminum Platform Structures for Parc flottant MacPherson, Magog, Quebec

Posted

August 21, 2026

Respond By

September 18, 2026

Identifier

24174-S

NAICS

332312, 332313, 332323

This opportunity is for the fabrication of aluminum platform structures for Parc flottant MacPherson in Magog, Quebec, issued by Escapades Memphrémagog inc. - Government Buyer: - Escapades Memphrémagog inc. (Quebec-based organization) - Scope of Work: - Workshop fabrication of six aluminum platform structures - Structures specified in CJA plans dossier 24174-S, revision 1 - No installation, assembly of cofferdams, decking, or park equipment included - Products/Services Requested: - Plate-forme 101: 1 unit (part number 24174-101) - Plate-forme 102: 2 units (part number 24174-102) - Plate-forme 103: 2 units (part number 24174-103) - Plate-forme 104: 1 unit (part number 24174-104) - All structures fabricated from aluminum alloy 6061-T6 - Workshop fabrication includes procurement, cutting, drilling, machining, welding, assembly, and quality control - Unique/Notable Requirements: - Compliance with CSA S157 and CAN/CSA-W59.2 standards - Welding must be performed by a workshop certified to CAN/CSA-W47.2 - Proof of workshop certification, material certificates, and compliance documentation required - Structures must be ready for pickup or transport to a dry storage location in the Magog region - OEMs and Vendors: - No specific OEMs or vendors named; all aluminum and components must meet technical requirements - All technical requirements are detailed in the project plans; no brand or proprietary products specified

Description

Escapades Memphrémagog inc. is soliciting qualified companies to tender for the workshop fabrication of six aluminum platform structures for the Parc flottant MacPherson project in Magog, Quebec. The contract scope is limited to the fabrication of aluminum platform structures only, excluding installation, assembly of cofferdams, decking, and other park equipment. The work includes procurement of aluminum, cutting, drilling, machining, welding, assembly, and quality control in the workshop. The completed structures must be ready for pickup by March 1, 2027, with an option for transport to a dry storage location in the Magog region.

View original listing