Opportunity

SAM #PANAPG26052959

Minor Construction and Plumbing Restoration at Aberdeen Proving Ground, Building 4401

Buyer

AMC ACC Accountable Contracting Officers

Posted

August 21, 2026

Respond By

August 25, 2026

Identifier

PANAPG26052959

NAICS

236220, 238220, 238110, 237110, 238910

This opportunity from the U.S. Army Contracting Command - Aberdeen Proving Ground (ACC-APG) focuses on minor construction and plumbing restoration services for Building 4401 at Aberdeen Proving Ground, Maryland. - Government Buyer: - U.S. Army Contracting Command - Aberdeen Proving Ground (ACC-APG) - Sub-agency: Aberdeen Proving Ground - Scope of Work: - Demolition of existing tile, walls, and concrete flooring - Wet-saw cutting of 205 linear feet of concrete - Trench excavation to access and replace failing cast iron main drain line and branch lines - Replacement of drain lines with new Schedule 40 PVC piping (per International Plumbing Code standards) - Repouring concrete subfloor and applying floor leveling thinset - Installation of approximately 2,000 square feet of ceramic tile in a patterned design - Facility protection, debris removal, and comprehensive site safety and quality control - Personnel Requirements: - Contractor must provide a Project Manager and Site Safety & Health Officer/Quality Control Manager - Compliance: - Adherence to Davis-Bacon wage determinations - Compliance with safety, environmental, and security regulations - No specific OEMs, vendors, products, or part numbers are mentioned - All materials, equipment, and labor must be provided by the contractor - Period of performance is 10 weeks (70 calendar days) - Unique Requirements: - Plumbing installation must meet IPC standards - Architectural restoration includes patterned ceramic tile installation - Contractor responsible for facility protection and debris removal throughout project

Description

The Government requires minor construction and facility restoration services for Building 4401 at Aberdeen Proving Ground. The requirement includes the demolition of existing tile and concrete flooring, wet-saw cutting of 205 linear feet of concrete, and trench excavation. This provides access to replace a failing cast iron main drain line and branch lines with new Schedule 40 PVC. Subsequent architectural restoration includes repouring the concrete subfloor, applying floor leveling thinset, and installing approximately 2,000 square feet of ceramic tile in a patterned design. The period of performance is 10 weeks (70 calendar days).

View original listing