Opportunity

SAM #1333ND26QNB640546

Procurement of Small-Volume Gas Pycnometer for NIST

Buyer

DEPT OF COMMERCE NIST

Posted

August 21, 2026

Respond By

September 03, 2026

Identifier

1333ND26QNB640546

NAICS

334516, 333999, 333314

This opportunity is issued by the Department of Commerce, National Institute of Standards and Technology (NIST), Acquisition Management Division, for the procurement of a small-volume gas pycnometer. - Government Buyer: - Department of Commerce - National Institute of Standards and Technology (NIST) - Acquisition Management Division - Products/Services Requested: - Small-volume gas pycnometer - No part numbers or quantities specified in the notice - OEMs and Vendors: - No specific OEMs or vendors mentioned in the notice - Unique or Notable Requirements (from amendment Q&A): - Must comply with SBA nonmanufacturer rule and small-business size standards - Sample volume requirements clarified - Temperature control specifications required - Warranty provisions must be included - Installation and training required - Gas regulator specifications detailed - Quotation submission methods clarified - All technical and operational requirements are referenced in the attached procurement document, which remains unchanged after the amendment.

Description

This soliciation is being amended to answer questions.

Does the SBA nonmanufacturer rule apply, and has a class or individual waiver been issued for this acquisition?    NO May a small-business reseller furnish an otherwise compliant product manufactured by a company exceeding the solicitation’s 1,250-employee size standard?   YES Does the 0.1 cm³ requirement refer to sample-cell capacity or minimum measurable sample volume?  YES Would a system with temperature control beginning at 4°C be unacceptable where the requirement states at least 3°C–60°C?  4 WOULD BE ACCEPTABLE Must the three-year warranty be provided directly by the OEM, or may the prime provide equivalent warranty coverage?  OEM Are installation, commissioning, calibration or user training required?   NO Are there specified connection or pressure requirements for the two-stage gas regulator?   NO Please confirm whether email is the required quotation-submission method.   EMAIL

No additonal changes have been made.

Please review the attachment.

View original listing