Tattnall County Solicits Bids for Magnolia Road Construction Project
Posted
August 19, 2026
Respond By
September 25, 2026
Identifier
PE-77074-NONST-2027-000000039
NAICS
237310
This opportunity involves the construction of a new 0.67-mile roadway along Magnolia Road in Tattnall County, Georgia. - Government Buyer: - Tattnall County Board of Commissioners (77074) - Scope of Work: - Construction of 0.67 miles of new roadway following the existing unpaved alignment - 10-foot paved travel lanes with 2-foot shoulders - Installation of 18-foot-wide roadside drainage ditches to convey stormwater runoff - 36-inch cross-drainage structure beneath Curve #2 - Fourteen paved driveway connections with associated drainage pipes - Products and Quantities: - Approximately 9,586 square yards of graded aggregate base course (GAB) - Approximately 1,617 tons of asphalt pavement - 14 paved driveway connections - 1 cross-drainage structure (36-inch) - Services: - Roadway construction, paving, drainage installation, and driveway connections per Georgia Department of Transportation (GDOT) 2021 standards - Unique Requirements: - All work must comply with GDOT Standard and Supplemental Specifications (2021 Edition) - Contractors and subcontractors must be licensed in Georgia and meet insurance and bonding requirements - Mandatory pre-bid meeting required for all bidders - No specific OEMs or branded products are mentioned; materials must meet GDOT standards.
Description
This project involves the construction of approximately 0.67 miles of new roadway along Magnolia Road in Tattnall County. The work includes following the existing unpaved alignment, providing improved access to residential and agricultural properties, and establishing a connection to U.S. Highway 280 to enhance local mobility and connectivity. The roadway will feature 10-foot paved travel lanes with 2-foot shoulders and roadside drainage ditches approximately 18 feet wide, designed to convey stormwater runoff toward a 36-inch cross-drainage structure beneath Curve #2. The project also includes installing fourteen paved driveway connections with drainage pipes to maintain access and drainage. Construction quantities include approximately 9,586 square yards of graded aggregate base and 1,617 tons of asphalt pavement. All work must conform to GDOT standards and specifications, including the 2021 Edition of the Standard Specifications and Supplemental Specifications.