Opportunity

CanadaBuys #2027-010

Central Plant Upgrades Phase 1 at St. Clair College – Replacement and Installation of Mechanical and Electrical Equipment

Posted

August 19, 2026

Respond By

September 14, 2026

Identifier

2027-010

NAICS

238290, 238220

St. Clair College of Applied Arts and Technology is seeking proposals for a central plant upgrade at its Windsor Campus. - Government Buyer: - St. Clair College of Applied Arts and Technology (Windsor Campus) - Scope of Work: - Replacement of four boiler pumps (with VFDs, piping, valves, accessories, instrumentation, and controls to maintain minimum 600 BHP capacity) - Replacement of one bypass control valve (with piping, controls, instrumentation, supports, and appurtenances) - Replacement of one domestic cold water booster pump system (including VFDs, controls, flow meter, piping, accessories, supports, and appurtenances) - Removal of three shell-and-tube heat exchangers - Installation of three owner-supplied plate-and-frame heat exchangers (with piping, air separators, chemical dosing pots, filters, control valves, instrumentation, controls, supports, and appurtenances) - Unique Requirements: - Maintain continuous operation during construction - Electrical power and control wiring, BAS integration, programming, graphics, testing, commissioning - Flushing, cleaning, chemical treatment, startup, performance verification - Removal and disposal of existing equipment - Restoration of affected areas - One-year guarantee on all work, equipment, and materials from substantial completion - OEMs and Vendors: - No specific OEMs, brands, or part numbers are mentioned in the notice - Products/Services Requested: - Mechanical and electrical equipment replacement and installation - Associated controls, instrumentation, and integration services

Description

The solicitation seeks proposals for the replacement and installation of equipment at St. Clair College of Applied Arts and Technology – Windsor Campus in Ontario. The scope includes replacing boiler pumps, bypass control valve, domestic cold water booster pump system, and heat exchangers, along with associated piping, controls, instrumentation, and accessories. The work requires maintaining continuous operation during construction and includes electrical power, BAS integration, testing, commissioning, and removal of existing equipment. The contract duration is estimated to end before March 31, 2027, with a one-year guarantee on work and materials from substantial completion.

View original listing