Opportunity
City of Key West Demandstar #ITB 26-014
Construction of Second Stormwater Injection Well at Key West Pump Station
Posted
August 18, 2026
Respond By
September 23, 2026
Identifier
ITB 26-014
NAICS
237110, 237990
This opportunity involves the construction of a second stormwater injection well at the Patricia & Ashby Stormwater Pump Station in Key West, Florida. - Government Buyer: - City of Key West, Monroe County, Florida - OEMs and Vendors Mentioned: - A.C. Schultes of Florida, Inc. - Accurate Drilling Systems, Inc. - Belle Construction Services LLC - C.C. Control Corp. - Charley Toppino & Sons Inc. - Core & Main - Engineered Coatings Solutions LLC - Flotech Environmental, LLC - Hinterland Group, LLC - ICON Supply, Inc. d/b/a ICON Technologies - Layne Christensen Company - Nearshore Electric, Inc. - Safa Construction, LLC - SanPik - U.S. Water Services Corporation - Verdantas LLC - Xylem Inc - Youngquist Brothers, Inc. - Products/Services Requested: - Permitting and construction of a stormwater injection well - Installation of well casing and well head piping with air valve in manhole - Removal and replacement of two 24-inch isolating plug valves in new concrete vaults - Installation of a new 24-inch spool and connection piping - Surface restoration (asphalt pavement, shoulder, sidewalk) - Unique/Notable Requirements: - Compliance with all plans, specifications, codes, and permitting requirements - All labor, materials, equipment, and services necessary for a fully operational facility - Site preparation, maintenance of traffic, erosion and sediment control - Well drilling and civil work for stormwater management - Restoration of disturbed surfaces - OEMs highlighted: Xylem Inc, Layne Christensen Company, Youngquist Brothers, Inc.
Description
This solicitation is for the permitting and construction of a second stormwater injection well at an existing stormwater pump station. The work includes installing well casing and well head piping with an air valve in a manhole, replacing two 24-inch isolating plug valves in new concrete vaults, and installing new spool and connection piping. Surface restoration will involve asphalt pavement, unimproved shoulder, and concrete sidewalk. The contractor must perform all work in accordance with plans, specifications, applicable codes, and permitting requirements.