Opportunity
Saskatchewan Tenders #CS-2026-02
Accessible Multi-Use Recreation Trail Construction in La Ronge, Saskatchewan
Posted
August 19, 2026
Respond By
September 09, 2026
Identifier
CS-2026-02
NAICS
237310, 237990
The Town of La Ronge, Saskatchewan is seeking bids for the construction of an accessible, multi-use recreation trail. - Government Buyer: - Town of La Ronge, Director of Community Services (Connor Tessier) - Scope of Work: - Construction of a recreation trail at Block/Parcel MR11, Plan 102441855, Surface Parcel No. 204122786 - Includes site preparation, excavation, removal and disposal of organics, delivery of materials, trail construction, clearing, drainage, and quality control - Minimum trail length of 200 meters with a looped path and connecting section - Three accessible rest areas and three accessible recreation spaces - Accessibility Requirements: - Must comply with Accessible Saskatchewan Act, CSA/ASC B651, and CAN-ASC-2.1 - Minimum clear tread width of 2.0 meters, overhead clearance of 2.4 meters, preferred longitudinal grade of 5% or less - Surface must be firm, stable, slip-resistant, and suitable for wheelchairs and mobility devices - Warranty: - Minimum two-year warranty covering settlement, erosion, surface failure, drainage deficiencies, and workmanship defects - Pricing: - Lump-sum pricing required for the complete construction - No specific OEMs, vendors, products, or part numbers are mentioned in the solicitation
Description
The Town of La Ronge is soliciting tenders for the construction of an accessible, multi-use recreation trail located at Block/Parcel MR11, Plan 102441855, Ext. 0, Surface Parcel No. 204122786 in La Ronge, Saskatchewan. The project includes site preparation, excavation, trail construction with accessibility features, drainage, clearing, and quality control. The trail will be approximately 200 meters long with a looped path and must comply with accessibility standards such as the Accessible Saskatchewan Act and CSA/ASC B651. The work must be completed between September 17, 2026, and November 15, 2026, with a minimum two-year warranty on the construction.