Opportunity

San Jacinto Community College Ionwave #CSP #26-15

SJCCD Building S10 Roof Refurbishment – South Campus, Houston, TX

Posted

August 18, 2026

Respond By

September 09, 2026

Identifier

CSP #26-15

NAICS

238160, 236220, 238190

San Jacinto Community College District (SJCCD) is seeking proposals for a comprehensive roof refurbishment project at Building S10, South Campus, Houston, TX. - Government Buyer: - San Jacinto Community College District (SJCCD), South Campus - Facilities Buyer: Genevieve Scholes; Vice Chancellor, Fiscal Affairs: Teri Zamora - Scope of Work: - Replacement of existing standing seam metal roof (low canopy) with new mechanically seamed structural metal roof panels - Restoration and recoating of modified bitumen roof membrane system using primer and silicone roof coating, including walkways and safety stripe coating - Removal and replacement of metal coping with prefinished aluminum coping system - Selective exterior envelope repairs: masonry and sealant repairs, through-wall flashing repairs - Roof drain repairs with retrofit inserts, rerouting internal roof drains to exterior, and associated drainage improvements including porous grass-paving drainage system and site drainage modifications - Infrared moisture scan and replacement of wet roof insulation - Structural shoring, demolition, and tree protection measures - Services: - Comprehensive construction services: project management, scheduling, safety compliance (OSHA), insurance, performance and payment bonds, warranty, coordination with Owner and Design Consultant - Submission of subcontractor qualifications - Notable Requirements: - Compliance with prevailing wage rates for Texas Gulf Coast - Liquidated damages of $500 per day for late completion - Substitution requests for specified products permitted, subject to approval - Coordination with architectural, civil, structural, and plumbing consultants (Huitt-Zollars, Dally + Associates) - Estimated Contract Value: - Approximately $900,000 - OEMs: - No specific OEMs or product brands are named; bidders may propose substitutions for specified products, subject to approval - Engineering Disciplines: - Architectural, civil, structural, and plumbing - Project Documents: - Project manual, drawings, and procurement documents available for review

Description

San Jacinto Community College District is soliciting competitive sealed proposals for the refurbishment of the roof at Building S10 located at the South Campus in Houston, Texas. The project includes replacement of the existing standing seam metal roof at the low canopy, selective exterior envelope repairs, restoration of the existing modified bitumen roof membrane system with a primer and silicone roof coating system, rerouting of the existing internal roof drains to the building exterior, and associated drainage improvements at the building perimeter. Work is scheduled to start in September 2026 and complete by December 2026. The estimated project cost is approximately $900,000.

View original listing