Opportunity
Santa Clarita Valley Water Agency PlanetBids #CIP27-1026 TASK 2
Ridge Route Water Tank Relining and Rehabilitation Project for Santa Clarita Valley Water Agency
Posted
August 18, 2026
Respond By
September 29, 2026
Identifier
CIP27-1026 TASK 2
NAICS
238320, 237110
This opportunity from the Santa Clarita Valley Water Agency focuses on the relining and rehabilitation of the Ridge Route potable water storage tank in Castaic, California. - Government Buyer: - Santa Clarita Valley Water Agency (SCV Water) - OEMs and Vendors: - Sherwin Williams (specified for protective coatings) - Fiberglass ladder and steel components to be provided by contractor (no specific OEMs named) - Products/Services Requested: - Sherwin Williams Sher-Plate 600 epoxy coating system for interior tank surfaces (NSF ANSI Standard 61 certified) - New fiberglass reinforced plastic (FRP) ladder with safety climb device - Replacement c-channel roof rafters (up to 5) - New welded steel ring halo (11-foot diameter) for roof support - Surface preparation and application of coatings per SSPC SP-10 and SP-18 standards - Removal and disposal of existing linings and corroded ladder - Grinding of sharp edges caused by corrosion - Limited weld repairs to deteriorated roof areas - Mobilization and demobilization - Optional mechanical and welding repair work - Dehumidification equipment (optional) - Unique/Notable Requirements: - Contractor must hold a C-33 Painting and Decorating Contractor License - Minimum five years of experience in steel water storage tank projects - All coatings must meet NSF ANSI Standard 61 and AWWA standards - Strict safety protocols for site visits, including release of liability forms - Mandatory pre-bid meeting and bid security required - Prevailing wage and Department of Industrial Relations registration - Two-year guarantee period for workmanship and materials - Liquidated damages of $1,000 per day for late completion - Project duration: 92 calendar days from Notice to Proceed - Inspection and Maintenance: - Warranty inspection and ongoing maintenance recommended every 3-5 years - Inspection services include comprehensive coating evaluation per ASTM and SSPC standards
Description
The Ridge Route Tank Relining Project involves relining the interior surfaces of the Ridge Route Tank, including surface preparation and application of protective coatings. The scope includes removal of existing interior linings above the overflow elevation, replacement of a corroded interior ladder with a new fiberglass unit with safety climb device, limited grinding of sharp edges due to corrosion, installation of a new welded steel ring halo, replacement of up to five roof structure rafters affected by corrosion, and limited weld repairs to deteriorated roof areas. The project requires a C-33 license and falls under classifications 237110 and 238320. Bids are to be submitted electronically by September 29, 2026, with a mandatory pre-bid meeting on August 27, 2026.