Opportunity
PIEE #W9123826BA012
USACE Sacramento District requests construction services for new pumping plant facility in Sacramento, CA
Buyer
W075 ENDIST SACRAMENTO
Posted
August 13, 2026
Respond By
September 01, 2026
Identifier
W9123826BA012
NAICS
237110, 237990
The United States Army Corps of Engineers (USACE) Sacramento District is soliciting bids for the construction of a new pumping plant facility in Sacramento, California. - Government Buyer: - United States Army Corps of Engineers (USACE), Sacramento District (SPK) - Project Scope: - Demolition of the existing Pumping Plant 5 (PP5) - Construction of a new PP5 facility approximately 300 feet up the canal - Includes levee improvements: seepage berms, adjacent levee enhancements, and raising discharge pipes above the 200-year water surface elevation - Products/Services Requested: - Construction services for heavy and civil engineering - No specific products, part numbers, or OEMs listed - Unique Requirements: - Offer submissions must include a Material Safety Data Sheet (MSDS) per FAR Clause 52.223-3 - OEMs and Vendors: - No OEMs or named vendors specified in the solicitation - Notable Details: - Project is part of the American River Common Features, Natomas Basin Project, authorized by the Water Resources Reform Development Act of 2014
Description
*** Amendment 0002 has been issued****** Amendment 0001 has been issued ***The United States Army Corps of Engineers (USACE) Sacramento District (SPK) is issuing a solicitation for the requirement to construct a new pumping plant facility in Sacramento, CA. The American River Common Features, Natomas Basin Project was authorized by the Water Resources Reform Development Act of 2014. The Natomas Basin is divided into nine reaches, A through I. RD-1000¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿¿s Pumping Plant 5 (PP5) is in Reach B, located along the Sacramento River near the landside toe of the levee and south of Interstate 5. PP5 is designed to discharge drainage from the West Drainage Canal to the Sacramento River following any significant amount of rainfall. The existing PP5 is in the path of completing the Reach B levee improvements that includes seepage berm, adjacent levee, and raising discharge pipes above the 200-year water surface elevation. The existing PP5 will be demolished, and a new facility will be constructed about 300 feet up the canal to allow for the levee features to be constructed .Point of Contact: Antonina Beal, Contract Specialist. Email: Antonina.Beal@usace.army.mil. Please refer to the full solicitation document for all detailed instructions, clauses, and submission requirements.