Opportunity
City of Laredo Ionwave #FY26-ENG-52
Springfield Avenue Extension Phase 1 Construction – City of Laredo
Posted
August 17, 2026
Respond By
September 10, 2026
Identifier
FY26-ENG-52
NAICS
237110, 237310, 237990
The City of Laredo Engineering Department is seeking bids for the Springfield Avenue Extension Phase 1, a major civil construction project. - Government Buyer: - City of Laredo Engineering Department - Products and Materials Requested: - Extensive water infrastructure: PVC water mains (8" and 12"), gate valves, fire hydrants, ductile iron fittings, air release/vacuum valves - Sanitary sewer system: PVC sewer mains (8", 10", 15"), steel casing, manholes (FRP and concrete), bypass piping and pumping - Storm drainage: Reinforced concrete pipe (RCP) in multiple sizes (24", 30", 36", 42"), concrete box culverts, wingwalls, storm drainage inlets, junction boxes - Roadway and site work: 13,600 SY of pavement, 57,700 SF of sidewalks, ramps, striping, concrete driveways, curbs, caliche base, sawcut/repair asphalt - Fencing and landscaping: Woven wire game fence, gates, trees (Live Oak, Mexican Olive), river gravel, decomposed granite, automatic irrigation system - Traffic and safety: Reflective pavement markings, raised pavement markers, signs, barricades, traffic control - Utility conduits: 6" PVC utility conduits - Trench safety: 5,052 LF of sheeting and bracing - Quantities: - 2,311 LF of 12" PVC water main, 8 fire hydrants, 711 LF of 8" sanitary sewer main, 619 LF of 42" RCP storm drain, 57,700 SF of sidewalks, 13,600 SY of pavement, and more - Unique/Notable Requirements: - Compliance with Build America, Buy America Act for steel - Bid deposit (minimum 5% of total base bid) - Completion of conflict of interest, non-collusive affidavit, and other disclosure forms - Federal labor standards apply - Electronic or hand delivery of bids with strict procedures - No specific OEMs or vendors are named; opportunity is open to qualified construction contractors - Contract duration is 220 working days; plans and specifications are available for free download
Description
The City of Laredo is soliciting bids for the Springfield Avenue Extension Phase 1 project. The scope includes constructing approximately 13,600 square yards of roadway pavement, 57,700 square feet of sidewalks, 1,500 linear feet of reinforced concrete pipe storm drains, 2,500 linear feet of PVC water main, and 950 linear feet of PVC sewer main, along with related ramps, striping, landscaping, appurtenances, and incidentals. The contract time for completion is 220 working days. Bidders are encouraged to submit electronically or by hand delivery, with specific instructions provided for manual bid drop-off.