Opportunity

State Port Authority Alport #11700

Roof Replacement Project for Electrical Buildings at McDuffie Terminal, Alabama Port Authority

Posted

August 17, 2026

Respond By

September 04, 2026

Identifier

11700

NAICS

238160

The Alabama Port Authority is seeking contractors for roof replacements on two electrical buildings at the McDuffie Terminal in Mobile, Alabama. - Government Buyer: - Alabama Port Authority (Facilities Engineering) - Scope of Work: - Removal and disposal of existing roofing systems on two buildings - Installation of new SBS Modified Bitumen roof systems (minimum 2-ply, granular surfaced, white color) - Installation of vapor retarders, insulation (2" and tapered), stainless steel edge metal, and wood facia - Provision of new AC stand for one building - Compliance with ASCE wind code requirements and provision of stamped engineering documentation - Products/Services Requested: - Roofing materials and systems (no specific OEMs or part numbers provided) - Performance and labor/material bonds, insurance coverage - Mobilization/demobilization including port access credentials (TWIC card, APA badge, vehicle decal) - Asbestos testing and compliance with state/federal laws - 2-year contractor guarantee and minimum 10-year manufacturer warranty on roofing system - Unique Requirements: - Contractors must hold a current license from the State Licensing Board for General Contractors with appropriate classifications - Work must be coordinated with terminal shutdown windows and operational requirements - All work must be completed within 90 calendar days after notice to proceed - OEMs: - No specific OEMs or vendors are named; contractors must select roofing systems meeting specified standards - Notable: Roofing system must meet ASCE wind code and be accompanied by engineering documentation.

Description

This solicitation is a request for proposals to replace the roofs on two electrical buildings at the McDuffie Terminal, Alabama Port Authority. The project includes removal and disposal of existing roofs and installation of new roofing systems in accordance with specified requirements and applicable laws. The work must be completed within 90 calendar days after notice to proceed, with specific shutdown windows and coordination with terminal operations. Contractors must hold appropriate state licenses and provide required bonds and insurance. A non-mandatory pre-bid meeting and site visit are scheduled prior to the bid opening.

View original listing