Opportunity
Rancho California Water District Planet bids #RFB 254-2026
Rancho California Water District Vertical Turbine Pump Assembly for Well 133
Posted
August 17, 2026
Respond By
September 09, 2026
Identifier
RFB 254-2026
NAICS
333911
Rancho California Water District is seeking bids for a vertical turbine pump assembly for Well 133 rehabilitation. - Government Buyer: - Rancho California Water District, Procurement Office - OEMs and Vendors Mentioned: - Goulds (pump components) - USEM (vertical hollow shaft motor) - Cotey Chemical (liquid descaler) - Roscoe Moss (stainless steel screen and blank) - Products/Services Requested: - Deep-set vertical turbine oil-lubricated pump assembly (9THC16 Stage, NSF/ANSI 61 compliant) - Two-piece 416 SS intermediate and head shaft assembly (1-11/16 in.) - 150 HP USEM VHS Motor (HT69/H444TP, HO150V2SLG) - Column pipes (8-in. x 10-ft and 20-ft, ASTM A53) - Oil tube centralizers (8-in. x 2-1/2-in.) - Goulds tension assembly (older version, C6084 1003) - Carbon steel oil tube and line shaft assemblies (2-1/2-in. x 1-11/16-in. x 10-ft and 20-ft) - SCH 40 PVC sounding tubes (1-1/4-in. x 10-ft) - 304L SS Ful-Flo louvered screen and blank (6.625-in. OD x 0.250-in. wall x 10-ft) - Stainless steel cone strainer (6-in. x 16-3/4-in. NPT) - Banding, buckles, gaskets, miscellaneous shop supplies - Cotey Chemical liquid descaler (55-gallon drums) - Freight, delivery, and applicable taxes - Unique/Notable Requirements: - Pump must deliver 800 GPM at 500 feet TDH with minimum 79.4% efficiency - All coatings must be NSF/ANSI 61 approved - Warranty and technical advisory support required (installation and field labor excluded) - On-site technical support available within 48 hours upon request - Startup observation, inspection, testing, and performance verification included - Delivery lead time estimated at 6 to 8 weeks from award
Description
This solicitation is for the procurement of a Well 133 Vertical Turbine Pump Assembly. The scope includes supplying various components such as a 9THC16 Stage Oil-Lubricated Bowl Assembly, a Two-Piece 416 SS Intermediate & Head Shaft Assembly, a 150 HP USEM VHS Motor, column pipes, oil tube centralizers, tension assembly, oil tube & line shaft assemblies, sounding tubes, screens, strainers, and other related materials and supplies. The work site is located at 42135 Winchester Road, Temecula, CA. Bidders must comply with all technical and administrative requirements and submit bids electronically by the deadline of September 9, 2026, at 2:00 PM PDT.