Opportunity
SAM #W519TC-26-R-A072
Utility Installation for RV Campground Site at Rock Island Arsenal
Buyer
W6QK ACC-RI
Posted
August 17, 2026
Respond By
August 24, 2026
Identifier
W519TC-26-R-A072
NAICS
237110, 237130, 237120
This opportunity from the US Army Garrison Rock Island Arsenal seeks contractors for utility installation at a new RV Campground Site. - Government Buyer: - US Army Garrison, Rock Island Arsenal - Directorate of Public Works, Engineering and Services Division - Scope of Work: - Install an 8-inch HDPE water main parallel to an existing 4-inch main - Includes fire hydrant and main valve for future connection - Install a 1-inch poly gas main from the existing 8-inch gas main to the new Comfort Station - Includes isolation valve and gas meter - Install a 13.8 KV overhead electrical feed on poles to a 750 KVA transformer near the Comfort Station - Excavation, repair, and restoration of disturbed areas to match original conditions - Requirements: - Compliance with Iowa State Urban Design and Specifications Program (SUDAS) 2026 standards - Environmental, safety, and security compliance - Performance and payment bonds required - Total small business set-aside - No specific OEMs, vendors, or part numbers are listed - Liquidated damages of $1,000 per day for delays beyond 180 working days - Full details in the attached Statement of Work
Description
The Army Contracting Command – Rock Island is issuing this pre-solicitation synopsis for W519TC-26-R-A072. This pre-solicitation synopsis is notice regarding the Install of Utilities for RV Campground Site located on the Rock Island Arsenal, Rock Island, IL. The solicitation is anticipated to be forthcoming and will have all the necessary documents. Please see the attached Scope of Work (SOW) PR 2023-0742 for detailed project requirements.
This requirement will be a 100% total small business set-aside.
Performance and Payment Bonds are required.
Project Summary – This project consists of furnishing labor, equipment, and material to install utilities for a new RV Campground Site. The work includes the installation of an 8" HDPE water main with a fire hydrant, a 1" poly gas main with a meter, and a 13.8 KV overhead electrical feed to a 750 KVA transformer. The scope also includes excavation and the repair of existing surfaces to match the original condition.
Please monitor SAM.gov for the official solicitation, which will provide detailed project requirements, specifications, and drawings.