Opportunity
Saskatchewan Tenders #HWY-H26097-APPN
Culvert Replacement and Roadway Repair near MacNutt, Saskatchewan
Posted
August 14, 2026
Respond By
August 31, 2026
Identifier
HWY-H26097-APPN
NAICS
237310, 237990
This opportunity from the Government of Saskatchewan's Ministry of SaskBuilds and Procurement seeks a contractor for culvert replacement and roadway repairs near MacNutt, Saskatchewan. - Government Buyer: - Ministry of SaskBuilds and Procurement, Government of Saskatchewan - Products and Materials Requested: - Two 2400 mm diameter polymer laminated corrugated steel pipe culverts (ministry supplied) - Three 1800 mm diameter polymer laminated corrugated steel pipe culverts (ministry supplied) - Four 1500 mm diameter smooth wall steel pipe culverts (contractor supplied) - Topsoil (20 m³), earth embankment (2500 m³), clay cap (640 m³), traffic gravel (340 t), riprap Type 1 (130 m³), riprap Type 2 (550 m³), silt fence (300 m), erosion control blanket (915 m²), seeding (4785 m²), granular backfill (1730 m³) - Services Requested: - Removal and disposal of existing culverts (145 m length) - Unique/Notable Requirements: - All polymer laminated corrugated steel pipe culverts are ministry supplied; smooth wall steel pipe culverts must be supplied and installed by the contractor - Total culvert installation length is 202 meters - Contractor responsible for supplying borrow material, granular base course, asphalt concrete, and erosion control materials - Work includes phased grade raise on Highway 381, to be completed in Spring 2027 - No specific OEMs or vendors are named; steel pipe culverts are specified by dimensions and material.
Description
This is an advance notice for the procurement of a Contractor to complete culvert replacements near MacNutt, Saskatchewan. The work involves installation of two 2400 mm diameter and three 1800 mm diameter Ministry supplied polymer laminated corrugated steel pipe culverts, and supply and installation of four 1500 mm diameter smooth wall steel pipe culverts by open excavation at three locations. The total length of the culverts is 202 meters. The project is expected to start as early as September 2026 with completion by October 31, 2026, and a grade raise on Highway 381 with phased completion in Spring 2027. Quantities and project details are subject to change.