Opportunity

Georgetown Ionwave #202666 Addendum 1

Cedar Hollow Water Line Improvements – City of Georgetown, TX

Posted

August 02, 2026

Respond By

August 20, 2026

Identifier

202666 Addendum 1

NAICS

237110, 237310, 238910

This opportunity involves the Cedar Hollow Water Line Improvements project in Georgetown, Texas, managed by the City of Georgetown Water Utility Board and Purchasing Department. - Government Buyer: - City of Georgetown, Water Utility Board, Purchasing Department - OEMs and Vendors Mentioned: - Profile Products LLC (Flexterra HP-FGM) - Multiple pavement marking OEMs for TxDOT standards: Apex Universal, Applied Ceramics, Ennis, Pac-Tec, Artuk, Batterson, 3M - Products Requested: - 44,200 linear feet of 8-inch PVC water line - 875 linear feet of 8-inch HDPE waterline (directional bore) - 40 gate valves - 98 fire hydrant assemblies - 170 8-inch 11.25 degree bends - 15 8-inch 22.5 degree bends - 85 8-inch 45 degree bends - 16 air release valves - 10 autoflush assemblies - Ductile iron pipe (AWWA standards) - Reinforced concrete pipe (ASTM standards) - Hot mix asphaltic concrete pavement - Concrete curb, gutter, sidewalks, driveways, flatwork - Flowable backfill - Riprap - Flexterra HP-FGM erosion control (50 bags, Profile Products LLC) - Pavement marking products (TxDOT pre-approved: jiggle bar tiles, raised pavement markers, traffic buttons) - Services Requested: - Construction staking - SWPPP and inspections - Trench safety plan (for trenches 5 feet or deeper) - Traffic control plan (sealed by Texas PE) - Tree pruning (ISA certified arborist) - Water service connections - Asphalt and concrete repair - Unique/Notable Requirements: - Flexterra HP-FGM (Profile Products LLC) specified for erosion control - HDPE pipe required for directional bores - Compliance with Williamson County pavement repair standards - TxDOT standards for pavement marking products (DMS-4100, DMS-4200, DMS-4300) - Prevailing wage, trench safety, environmental protection, and warranty requirements - Liquidated damages for late completion ($1,000/day) - Access to residents must be maintained throughout construction - Comprehensive documentation required: bid bond, insurance, safety plans, and experience statement - Project Duration: - 240 calendar days for substantial completion, 270 days for final completion - One-year warranty after final acceptance

Description

The City of Georgetown is soliciting sealed bids for the Cedar Hollow Water Line Improvements project. The work involves furnishing, installing, and providing all labor and materials for approximately 44,200 linear feet of 8-inch PVC water line improvements at various locations throughout the Cedar Hollow subdivision. The project scope includes installation of gate valves, fire hydrants, water service connections, asphalt repair, concrete repair, and other miscellaneous construction activities. Bids are to be submitted electronically or in sealed envelopes by August 20, 2026, with a public virtual bid opening to follow.

View original listing