Opportunity

Howard County Office of Procurement PlanetBids #IFB 2027-05

Howard County Solicits Construction for Guilford Stormwater Pond Repair and HydroTurf CS System Installation

Posted

July 22, 2026

Respond By

September 09, 2026

Identifier

IFB 2027-05

NAICS

237110, 237990, 238110

Howard County, Maryland is seeking qualified construction firms for the Guilford Stormwater Pond Repair and Water and Sewer Plans project. - Government Buyer: - Howard County, Maryland, Office of Procurement and Contract Administration, Stormwater Management Division - Products and Services Requested: - Major civil construction including: - Removal of existing concrete riser structure and pipes - Construction of a large concrete riser (approx. 17’ x 10’ x 12’) - Installation of two 48-inch reinforced concrete pipe (RCP) principal spillway culverts through a dam embankment - Construction of a large concrete storm drain junction box (approx. 9’ x 22’ x 8’) - Storm drain inlets, embankment grading, geosynthetic clay liner, concrete embankment armoring, and utility relocation - Installation of HydroTurf CS system, including: - AGRU 50 mil Super Gripnet HDPE Geomembrane (structured geomembrane component) - Engineered synthetic turf and HydroBinder cementitious infill - Erosion and sediment control, traffic maintenance, landscaping, and turf establishment - Specialized items such as cathodic protection, fire hydrants, ductile iron and steel pipes, and various stormwater and sewer structures - Extensive list of construction materials and components (see product line items) - Unique or Notable Requirements: - Contractors must have experience with dam construction and stormwater infrastructure - Compliance with Howard County's Equal Business Opportunity (EBO) program (15% subcontracting goal) - Living wage requirements and environmentally preferable product preferences - Survival rate requirements for landscaping and plant materials - Road closures and detours required on Guilford Road - Warranty period for landscaping is one year with specified survival rates - Liquidated damages of $500 per calendar day for delays - OEMs and Vendors: - AGRU (for the specified geomembrane component of HydroTurf CS system) - No other specific OEMs or vendors are named; most materials are standard construction commodities - Estimated Contract Value: - Likely in the $2,000,000 to $5,000,000 range based on project scope and complexity - Period of Performance: - Approximately 275 calendar days for construction completion - Dam Safety Permit allows up to five years for completion, with possible extensions

Description

Howard County is soliciting bids for the Guilford Stormwater Pond Repair and Water and Sewer Plans project. The work includes removal of an existing concrete riser structure, in-place abandonment and backfill of two existing pipes, construction of a large concrete riser and principal spillway culverts through the dam embankment, and installation of a storm drain junction box connecting multiple culverts. The project also involves embankment grading, installation of a geosynthetic clay liner, concrete embankment armoring, utility relocation, and coordination. Construction will require road closures and detours on Guilford Road, with two access points for construction approximately 0.6 miles east of the intersection with US Route 1. The project duration is approximately 275 calendar days.

View original listing