Opportunity
Amtrak #X103 26233
Amtrak Solicits Supplemental HVAC System Installation for Rochester Station Elevator Hoistway
Posted
August 12, 2026
Respond By
August 19, 2026
Identifier
X103 26233
NAICS
238220, 238290
Amtrak is seeking construction services to install supplemental HVAC systems for the platform elevator hoistway at the Rochester Amtrak Station in Rochester, New York. - Government Buyer: - National Railroad Passenger Corporation (Amtrak) - Products and Services Requested: - Supplemental HVAC equipment for the elevator hoistway - Must maintain temperatures between 60°F and 80°F and humidity between 35% and 60% (noncondensing), even with exterior temperatures from 100°F to -20°F - Includes insulation for the hoistway roof and infrared heat units near hoistway lighting - Construction services for assessment, procurement, installation, and integration of the HVAC system - Includes fire-rated wall repairs, roof insulation, and dedicated controls in the adjoining electrical room (not tied to the building's automation system) - Deliverables: as-built documents, testing and balancing, operation and maintenance manuals, warranty information, and training for facilities maintenance staff - Unique/Notable Requirements: - HVAC system must operate independently from the building's automation system - All work must comply with Amtrak standards, construction codes, and the EP4000 Document - System must provide reliable temperature and humidity control in a challenging environment (wide range of exterior temperatures) - No specific OEMs or vendors are named in the solicitation
Description
This solicitation involves assessing, installing, and integrating supplemental HVAC for the electrical room at the Rochester Amtrak Station in New York. The work includes fire-rated wall repairs and building automation system connectivity. The project scope requires HVAC equipment capable of maintaining specific temperature and humidity levels inside the hoistway, along with insulation of the roof. Deliverables include procurement, installation, as-built documents, testing, training, and compliance with Amtrak standards and construction codes.