Opportunity
SAM #W9126G26QA113
Erection of Government-Furnished Pre-Engineered Steel Building at Granger Lake, Texas
Buyer
USACE Fort Worth District
Posted
August 14, 2026
Identifier
W9126G26QA113
NAICS
332311, 238190, 238120
This opportunity involves the erection of a government-furnished pre-engineered steel building at Granger Lake, Texas, for the U.S. Army Corps of Engineers, Fort Worth District. - Government Buyer: - U.S. Army Corps of Engineers, Fort Worth District (ENDIST FT WORTH) - Scope of Work: - Erection of a pre-engineered steel building provided by the government - Contractor must supply all necessary tools, equipment, labor, and supervision - Contractor is responsible for furnishing any additional materials not listed in SOW Attachment 1, subject to approval - Compliance Requirements: - Work must comply with SOW Section 13 34 19 METAL BUILDING SYSTEMS - Must follow the Metal Building Systems Manual (MBMA MBSM) - Adherence to manufacturer’s written erection instructions, approved shop drawings, and other erection documents is required - OEMs and Vendors: - No specific OEMs or vendors are named - Manufacturer’s templates and drawings referenced for compliance - Set-Aside: - Opportunity is set aside for SBA-qualified vendors - Notable Requirements: - Contractor must coordinate with the Contracting Officer’s Representative (COR) for approval of any additional materials - All work must meet industry and manufacturer standards for metal building systems
Description
SUBJECT: GOVERNMENT OWNED, PRE-ENGINEERED STEEL BUILDING ERECTION, GRANGER LAKE, TEXAS. PROPOSED SOLICITATION NUMBER: W9126G26QA113; POSTED ON OR ABOUT 20 AUGUST 2026. SOLICITATION CLOSING DATE: 10 SEPTEMBER 2026. DESCRIPTION: The contractor shall furnish all tools, equipment, labor, and supervision to erect a Government furnished pre-engineered steel building as shown in Statement of Work (SOW) Attachment 2 and in accordance with SOW Section 13 34 19 METAL BUILDING SYSTEMS. Materials required for the complete erection of the pre-engineered steel building not listed in SOW Attachment 1 shall be furnished by the Contractor and submitted to the COR for approval. Prior to erection, Contractor shall examine the concrete foundation and masonry bearing surfaces, anchor bolt size and placement, survey slab elevation, locations of bearing plates, and other embedments to receive structural framing with the metal building manufacturers templates and drawings as detailed in the SOW before erecting any steel components for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. Erect metal building system according to manufacturers written erection instructions, approved shop drawings and other erection documents in accordance with MBMA MBSM - Metal Building Systems Manual. Contractor shall perform all work in accordance with the SOW and the terms of the contract. Additional Links:Department of Defense Procurement ToolboxPIEE Solicitation Module Link for W9126G26QA113Registration Instructions for the PIEE Solicitation ModuleWeb Based Training for the PIEE Solicitation Module