Opportunity

Burbank-Glendale-Pasadena Airport Authority Planet bids #E27-01

Engineering Design Services for Runway 8-26 Pavement Rehabilitation at Hollywood Burbank Airport

Posted

July 13, 2026

Respond By

September 18, 2026

Identifier

E27-01

NAICS

541330

This opportunity seeks qualified engineering and design firms to provide comprehensive design services for the rehabilitation of Runway 8-26 at Hollywood Burbank Airport (Bob Hope Airport), managed by the Burbank-Glendale-Pasadena Airport Authority. - Government Buyer: - Burbank-Glendale-Pasadena Airport Authority (Hollywood Burbank Airport) - Federal Aviation Administration (FAA) involvement and funding - OEMs and Vendors: - No specific OEMs or proprietary vendors are named; the solicitation is open to qualified engineering and design firms - Notable engineering consultants referenced in technical attachments: HNTB (engineering), Earth Mechanics, Inc. (geotechnical) - Products and Services Requested: - Engineering design services for runway pavement rehabilitation, including: - Data collection (survey, soils, drainage, electrical) - Topography and site surveying - Soils investigation - Development of multiple pavement design concepts (FAA P-401, P-403, P-209 asphalt and base specifications) - Lifecycle cost analysis - Phased construction planning to minimize operational impact - Preparation of plans, specifications, and digital deliverables (PDF, AutoCAD) - Bid support and construction administration (RFIs, submittal reviews, as-built GIS data) - Construction-related products (for reference in design): - Asphalt surface and base courses (P-401, P-403) - Crushed aggregate base (P-209) - Slurry seal (P-626) - Permanent pavement markings (white, yellow, black) - Saw-cut grooves (P-621) - Specialized hot-mix asphalt (PG 70-10, PF 76-22M) - Joint and crack repair, cold milling, grooving, and painting - Unique or Notable Requirements: - All work must comply with FAA Advisory Circulars and Airport Improvement Program (AIP) grant requirements - Innovative phasing to minimize airport operational disruption, including nighttime construction and phased closures - Detailed asset documentation for integration into the airport's Enterprise Asset Management (EAM) and GIS systems - Digital deliverables required in both PDF and AutoCAD formats - Strict safety and operational coordination with FAA and airport operations - Project is funded with a mix of federal and local funds, with an estimated construction value up to $30 million - Period of Performance: - Design services begin upon contract execution, with design, bidding, and construction phases extending through project completion (anticipated design start in 2027, construction through 2029)

Description

The Burbank-Glendale-Pasadena Airport Authority is seeking design services for the rehabilitation of Runway 8-26 pavement at Hollywood Burbank Airport. The runway is the primary landing runway, measuring 5,802 feet long and 150 feet wide with 25-foot shoulders, intersecting the main departure runway 15-33. The project includes design services focusing on pavement support, maximizing design life, operational impact during construction, and budget constraints. The work will be performed under a Federal Aviation Administration Airport Improvement Program grant.

View original listing