Opportunity

SAM #W91WFU26QA012

Comprehensive Building Renovation and Repair at USAG-Stuttgart, Panzer Kaserne, Building 2901

Buyer

409th Contracting Support Battalion

Posted

August 13, 2026

Respond By

September 03, 2026

Identifier

W91WFU26QA012

NAICS

236220, 238220, 238210, 238310, 238290

This opportunity involves comprehensive repair and renovation services for Building 2901 at Panzer Kaserne, USAG-Stuttgart, Germany, managed by the Directorate of Public Works and the U.S. Army Contracting Command. - Government Buyer: - Directorate of Public Works (DPW), USAG-Stuttgart - U.S. Army Contracting Command, HQ Contracting KO Directorate - 409th Contracting Support Brigade, Regional Contracting Office Stuttgart - OEMs and Vendors Mentioned: - Kemmlit (urinal partitions) - Codelocks (CL520 door handles) - EVVA (4KS/RC4 door cylinders) - Kugelgarn (carpet tiles, Atlas 863 holunder) - Products and Services Requested: - Sanitary ware and fixtures: sinks, faucets, urinals with infrared flushers, toilet bowls with concealed flush tanks, metal sinks, partitions, showers, lockers - Tiles for floors and walls - Gypsum board ceilings with LED panels and sensor controls - Soundproof doors (STC 50 German SSK6) with Codelocks and EVVA cylinders - Carpet tiles (Kugelgarn, Atlas 863 holunder) and baseboards - Plumbing: replacement of main water pipes, cold/hot/circulation lines, shut-off valves, cold water filters, pressure reducers, hot water boiler feeding pipes, new circulation pump - Electrical and fire protection modifications - Demolition, drywall, painting, flooring, fixture installation, and final cleaning - Notable Requirements: - Temporary removal and reinstallation of radiators and toilet stalls for tile work - Installation of walk-in showers and lockers as selected by the customer - All work must include final cleaning, leak and functional testing, and coordination with the fire department - OEM manuals and as-built documentation required for some projects - Emphasis on small business participation (HUBZone, SDVOSB, WOSB, EDWOSB) - Safety compliance, quality control, and minimal disruption to building occupants - Quantities and Part Numbers: - 2 sinks, 2 faucets, 2 wall-mounted mirrors, 1 metal sink (male restroom), 1 metal sink (female restroom), 3 urinals with infrared flushers, 3 toilet bowls, 3 concealed flush tanks, 2 urinal partitions (Kemmlit), 2 walk-in showers, 2 entrance doors, 2 urinal partitions (Kemmlit), 2 soundproof doors (STC 50 German SSK6), 2 Codelocks CL520 handles, 2 EVVA 4KS/RC4 cylinders, 1 set of carpet tiles (Kugelgarn, Atlas 863 holunder) - Period of Performance: - Ranges from 60 to 120 calendar days per project, with some work orders specifying a 4-month duration - Some projects require on-site construction within 10 working days, others up to 60 working days - Unique Aspects: - Use of specific OEM products (Kemmlit, Codelocks, EVVA, Kugelgarn) - Detailed coordination with fire protection and customer scheduling - Requirement for as-built drawings and OEM manuals for certain installations

Description

This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. All performance requirements are defined in the attached Scope(s) of Work.

The objective of this contract includes, but is not limited to:

Mobilization and protection of existing Government Property; Selective Demolition and removal of existing materials; Repair and Replacement of damaged building components; Dry Wall and interior wall repairs; Painting and surface preparation; Flooring Replacement; Electrical Repairs and Associated Work; Plumbing Repairs and associated Work Replacement or installation of associated fixtures materials and equipment; Final Cleaning and inspection, documentation and closeout

The contractor shall coordinate all work to minimize disruption to government operations and shall maintain the work in a safe and orderly condition throughout performance. The contractor shall perform the work in accordance with the performance requirements stated in the SOW and applicable drawings and specifications.

Attachment -Request for Quote MARFOR REFRESH should be the first document in the sequence

OFFERORS MUST HAVE AN ACTIVE SAM REGISTRATION AND PROVIDE UEI NUMBER. 

SITE VISIT DATE: 19 AUG 26

DEADLINE TO REGISTER FOR SITE VISIT: 17 AUG 26 @10 AM

LOCATION: PANZER KASERNE BUILDING 2901

View original listing