Opportunity
SAM #N0038326QLA97
Repair and Overhaul of Boeing Aircraft Access Cover for NAVSUP
Buyer
NAVSUP WEAPON SYSTEMS SUPPORT
Posted
August 12, 2026
Respond By
September 11, 2026
Identifier
N0038326QLA97
NAICS
336413
This opportunity is for the repair and overhaul of a specific aircraft component for the U.S. Navy: - Government buyer: NAVSUP Weapon Systems Support Philadelphia (Department of the Navy) - OEM: Boeing - Repair facility: 6200 J S McDonnell Blvd, Saint Louis, MO - Product/service requested: - COVER, ACCESS, AIRCRA (Part Number: 74A140111-2010; NSN: 1560 016860091) - Services include repair, overhaul, upgrade, testing, and inspection to Ready For Issue (RFI) condition - Contractor requirements: - Provide all facilities, labor, materials, parts, and test equipment - Comply with ISO 9001/SAE AS9100 quality standards - Use SAE-AS22759 series wire (not MIL-W-81381) - Maintain a calibration system per ANSI/NCSL Z540.3 or equivalent - All parts/materials must be new unless otherwise approved - Repairs must be performed at the specified Boeing facility - Maintain configuration management and proper storage for items - Notable contract provisions: - Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) require government approval - Specific processes for handling special repair cases
Description
CONTACT INFORMATION 4 N792.10 T2Q N/A KIMBERLY.FLORES12.CIV@US.NAVY.MIL ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) 19 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT 8 X INSPECTION AND ACCEPTANCE OF SUPPLIES 26 X ... (additional similar entries) ... WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) 16INVOICE AND RECEIVING (COMBO) TYPETBDN00383TBDTBDSEE SCHEDULETBD NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18) 1 MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE 1 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026) 4 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024) 11 SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) 7 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 5 BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 1 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026) 13 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008) 2 X Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. The contractor must report all transactions accurately by the end of the fifth business day after receipt, and the Action Date in CAV must reflect the actual date of physical receipt. The contractor must obtain final inspection and acceptance by the Government within the RTATs established in the subsequent contract. Required RTAT: 90 days after receipt of asset. Throughput Constraint: The contractor must provide a throughput constraint for each NSN. Total assets to be repaired monthly after initial delivery commences X/month (contractor to fill in). A throughput of 0 per month indicates no throughput constraint. Induction Expiration Date: 365 days after contract award date. Assets received after this date are not authorized for repair without bilateral agreement between the contractor and NAVSUP WSS Contracting Officer. All contractual documents are considered issued when copies are deposited in the mail, transmitted by facsimile, or sent by other electronic methods such as email. The acceptance of the contractor's proposal constitutes a bilateral agreement to issue contractual documents as detailed.
1. Scope Articles to be furnished: shall be repaired, tested, and inspected according to the terms and conditions specified in the Requirements Section of this document. Equipment: Unless expressly provided elsewhere, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for manufacture and testing will not be provided by the Government and is the sole responsibility of the contractor. This applies regardless of references in drawings or specifications. Prohibition on MIL-W-81381 wire: The use of MIL-W-81381 wire is prohibited. SAE-AS22759 series wire shall be used instead. Questions should be directed to the Procuring Contracting Officer. Reference to MIL-STD-454: If referenced, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. Personnel performing tasks must be trained and certified as required by paragraph 5.1.4 of IPC/EIAJ-STD-001C. 2. Applicable Documents NOT APPLICABLE 3. Requirements 3.1 General This Statement of Work (SOW) establishes the criteria for repair and testing/inspection of the subject item, including inspection, component repair and replacement, reassembly, and testing procedures to return units to a serviceable condition. 3.2 Definitions CONTRACTOR: The successful offeror awarded a contract, order, or project work order. The term encompasses all such agreements. OVERHAUL: A disassembled, cleaned, inspected, repaired (components replaced or repaired as needed), reassembled, tested, and returned to a Ready for Issue (RFI) condition. REPAIR: Restoring a part to RFI condition by replacing or repairing defective components and testing according to the repair manual. 3.3 Scope The items shall be overhauled, upgraded, repaired, tested, inspected, and accepted per the contract terms. Equipment such as fixtures, jigs, dies, etc., will not be provided by the Government unless expressly specified. The contractor shall provide the necessary facilities, labor, materials, parts, and test and tooling equipment to return items to RFI condition, including specific items like COVER, ACCESS, AIRCRAFT with part number 74A140111-2010 and NSN 1560 016860091. 3.4 Changes and Process Control Any changes to repair manuals, drawings, or specifications require approval from the Procuring Contracting Officer (PCO). Repairs using unapproved changes are at the contractor's risk, and the contractor shall replace any such items if disapproved. References on drawings/specifications should be read as the