Opportunity

Garland Ionwave #REQ00002496

City of Garland Solicits Bids for 2026 Alley Improvements Group 2 – Concrete Pavement Replacement and Subgrade Stabilization

Posted

August 11, 2026

Respond By

August 25, 2026

Identifier

REQ00002496

NAICS

237310, 238990

The City of Garland is seeking bids for the 2026 Alley Improvements Group 2 project, focused on the removal and replacement of concrete alley pavements across multiple locations in Garland, Texas. - Government Buyer: - City of Garland, Procurement & Contracts Division - Engineering support by Lam Consulting Engineering - Scope of Work: - Removal and replacement of existing concrete pavement with new Portland Cement Concrete - Subgrade improvements using lime stabilization, flexible base, or compacted natural subgrade - Topsoil preparation and installation of Bermuda grass sod for restoration - Erosion control measures and traffic management during construction - Utility coordination and compliance with City and NCTCOG specifications - Technical Details: - Concrete pavement thickness generally 8 inches (alternative up to 10 inches) - Lime additive for subgrade stabilization varies by site (4% to 12%) - Flexible base subgrade (6 inches, Type D, with 5% cement slurry as alternative) - Total project length: approximately 4,256 linear feet (0.81 mile) - Notable Requirements: - Project budget estimated between $1,100,000 and $1,500,000 - Bid bond (5%) required; performance, payment, and 2-year maintenance bonds upon award - All bids must be submitted electronically via the Ion Wave portal - Virtual pre-bid meeting available - No specific OEMs or proprietary products required; open to qualified civil construction contractors

Description

The City of Garland is soliciting bids for the 2026 Alley Improvements Group 2 project, which involves improvements to various alleyways in Garland, Texas. The project includes removal and replacement of existing concrete pavement with new Portland Cement Concrete, underlain by lime stabilized subgrade, flexible base, or compacted natural subgrade. The construction is anticipated to start in August/September 2026 with a duration of 120 working days. The owner's targeted budget range for the project, including allowances, is between $1,100,000 and $1,500,000. A bid bond of 5% and performance, payment, and maintenance bonds will be required.

View original listing