Opportunity

Dept of Management Services Florida #PD 25-26.106

Perdido Landfill South Pond Drainage and Filtration Improvements Solicitation

Posted

August 05, 2026

Respond By

August 26, 2026

Identifier

PD 25-26.106

NAICS

237110, 237990

Escambia County Department of Waste Services is seeking a contractor for improvements to the south stormwater pond at the Perdido Landfill in Cantonment, Florida. - Government Buyer: - Escambia County Department of Waste Services, Office of Purchasing - Scope of Work: - Enhance the underdrain pipe network and sand filtration layer of the south pond - Tasks include: - Mobilization, demobilization, and general conditions - Erosion and sediment control - Surveying - Demolition of existing structures - Pond grading - Installation of a new sand infiltration layer with specified permeability - Installation of a new underdrain pipe network (HDPE drainage piping) - Topsoil placement and sod - Re-establishment of outlet protection - Contractor must provide all labor, materials, equipment, supervision, and incidentals - Proper disposal of existing drainage piping and materials per landfill requirements - Delivery of new materials through a designated side gate to minimize disruption - As-built documentation required in CAD, digital PDF, and hard copy formats - One-year construction warranty covering defects or failures in labor or materials - Notable Requirements: - Submission of a bid bond or certified check equal to 5% of the total offer - Evidence of bonding capacity from a Florida-licensed surety - Proof of financial stability - No specific OEMs or vendors are named in the solicitation - All work must comply with detailed construction plans and be completed within 90 days (plus 30 days for final completion, if needed)

Description

Escambia County Department of Waste Services is soliciting bids for improvements to the south stormwater pond at Perdido Landfill in Cantonment, FL. The project involves enhancing drainage capabilities focusing on the underdrain pipe network and sand filtration layer. The contractor must provide all labor, materials, equipment, and supervision to complete the project, including removal and disposal of existing materials, installation of new drainage components, and submission of as-built documentation. The work is expected to be substantially completed within 90 calendar days from the notice to proceed.

View original listing