Opportunity
SAM #N0010426QTC05
Repair Services Solicitation for Circuit Card Assembly (CAGE 88236, Ref. 899462X)
Buyer
NAVSUP Weapon Systems Support (WSS) Mechanicsburg
Posted
August 12, 2026
Respond By
August 17, 2026
Identifier
N0010426QTC05
NAICS
334412, 811219, 811210, 811213
NAVSUP Weapon Systems Support Mechanicsburg (NAVSUP WSS MECH), under the Department of the Navy, is seeking repair services for a Circuit Card Assembly. - Government Buyer: - Department of the Navy, NAVSUP Weapon Systems Support Mechanicsburg (NAVSUP WSS MECH) - OEM and Vendor Information: - The original manufacturer is identified by CAGE code 88236 (OEM name not specified; CAGE code should be referenced for identification) - Only authorized distributors of the OEM's item are eligible; proof of authorization is required - Product/Service Requested: - Repair services for Circuit Card Assembly - Reference Number: 899462X - CAGE Code: 88236 - Not a new supply; strictly repair - No specific quantity stated - Unique/Notable Requirements: - Repair Turnaround Time (RTAT) of 78 days from asset receipt to acceptance - Government Source Inspection required - Compliance with MIL-STD-130 marking - Reporting in the Commercial Asset Visibility (CAV) system - Option for increased quantity may be included in the contract
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) 19 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996) 2 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) 16 TBD TBD TBD N00104 TBD TBD See Schedule TBD TBD NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18) 1 MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE 1 noah.r.kuntz2.civ@us.navy.mil NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025) 1 OPTION FOR INCREASED QUANTITY (MAR 1989) 1 365 days CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015) 1 SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) 7 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026) 13 x x x x x NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENERGY PROGRAM USE (APRIL 2008) 2 x This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF). Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 78 Days. Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT o Unit Price:_______ o Total Price:____ o Repair Turnaround Time (RTAT): ____ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? ______________________________________________________________ ___________________________________________________________ _____________________________________________________________ Repair Turnaround Time (RTAT): the contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. Return is defined as the physical receipt of the asset at the contractor's facility as reflected in the Action Date in the Commercial Asset Visibility (CAV) system. The contractor must report all transactions by the end of the fifth business day after receipt, and the Action Date in CAV must reflect the actual receipt date. The contractor must obtain final inspection and acceptance by the Government within the RTATs. Check one: Firm-fixed-Price __ Estimated Return Material Authorization # (RMA), if applicable:____ Delivery Vehicle (if Delivery Order requested):____________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER): AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: ____ Inspection & Acceptance CAGE, if not same as "awardee CAGE": ____ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":____ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:____ New unit delivery lead-time:_______ The Government may add an option quantity to the contract. The Government can increase the quantity at the unit price specified, exercised by written notice within FAR 52.217-6 timeframe. Delivery of added items continues at the same rate unless otherwise agreed. 1. Scope 1.1 This contract/purchase order contains the requirements for repair and the quality requirements for the CIRCUIT CARD ASSEMB. 2. Applicable Documents 2.1 The listed documents form part of this contract, including modifications or exclusions. 2.1.1 The "Document References" must be obtained by the contractor. Ordering info is attached. 3. Requirements 3.1 Cage Code/Reference Number Items - The CIRCUIT CARD ASSEMB shall meet operational and functional requirements as per listed Cage Codes and reference numbers. All repair work shall follow the contractor's standards, manuals, and directives, including drawings, technical orders, and approved repair standards. CAGERef. No. 88236899462X 3.2 Marking - The item shall be identified per MIL-STD-130, REV N, 16 NOV 2012. 3.3 Changes in Design, Material, or Part Number - Changes require notification and approval from NAVICP-MECH Contracting Officer, with detailed explanations and drawings if available. Changes are classified by codes 1 through 6, indicating the type of change. 4. Quality Assurance 4.1 Responsibility for Inspection - The contractor is responsible for all inspections, which may be performed by the government if necessary. 4.2 Responsibility for Compliance - All items must meet contract requirements. Inspection records shall be kept for 365 days after final delivery. 4.3 Records - Inspection records must be complete and available to the government during and after performance. 4.4 Inspection/Testing Repaired Items - The contractor shall perform all inspection and testing as per original specifications and drawings. 5. Packaging 5.1 Preservation, Packaging, Packing, and Marking shall follow the schedule and MIL-STD 2073. 6. Notes 6.1 Document References - Info available at the DODSSP website. Cancelled documents are available in paper format upon request. Other specifications can be obtained from publishers or specific offices listed. 6.2 Distribution Statements - Documents must include a distribution statement per OPNAVINST 5510.1, with codes A through X indicating distribution limits. 6.3 Notice to Distributors/Offerors - Only authorized distributors of the original manufacturer should submit offers, with proof of authorization on company letterhead. Additional Links: See Solicitation N0010426QTC05