Opportunity

SAM #70Z03926QCGA00050

Temporary Sewer Line Bypass System and Services for U.S. Coast Guard Academy

Buyer

USCG Academy

Posted

August 11, 2026

Respond By

August 31, 2026

Identifier

70Z03926QCGA00050

NAICS

237110, 237990

The U.S. Coast Guard Academy, under the Department of Homeland Security, is seeking a contractor to provide a temporary sewer line bypass system at its Groton, Connecticut facility. - Government Buyer: - U.S. Coast Guard, Coast Guard Academy - Contracting Officer: Alfred Chaney - Products & Equipment Requested: - Rental and installation of HDPE piping, valves, fittings, hoses, and related materials - Specific items include: - 4" x 10' composite hoses with 150# flange fittings (6 units) - 4" 150# flanged tee (1 unit) - 4" 150#FL x 4" MQD adapter (1 unit) - 4" 90-degree QD bends (5 units) - 4" 45-degree QD bends (5 units) - 4" x 20' QD pipes (20 units) - 4" x 50' heavy duty layflat hoses with QD fittings (8 units) - 4" x 10' black water suction hoses with QD fittings (6 units) - Road crossings (2 units) - 4" QD tee female x male x male (2 units) - 2" combination air valve ARI D-025-2 (2 units) - 4" gate valves with 150# flange (2 units) - Services Requested: - Mobilization and installation of the temporary bypass system - Operation, repairs, and monitoring of the system (including 12-hour repair response) - Demobilization and site restoration after permanent repairs - Unique/Notable Requirements: - System must maintain continuous utility service with a 600 gpm pump - Contractor must provide a State Licensed Plumber and a Project Manager - Compliance with EPA standards and lead inspection certifications required - Monthly progress reports and a draft project plan are required - Award will be made on a Lowest Price Technically Acceptable basis - No specific OEMs or brand names are mentioned; the requirement is for standard rental equipment and services.

Description

Temporary Sewer Line at the US Coast Guard Academy that requires immediate temporary service until a full term repair can be executed. 

QUOTE DUE DATE OF August 31, 2026 by 08:00AM Eastern Standard Time (EST).

QUESTIONS DUE August 25, 2026 by 8:00 PM Eastern Standard Time (EST).   

SITE VISIT- Walk through of pipe is scheduled on: August 20th, 2026 and August 21st, 2026 @1200-1400 (EST). 

View original listing