Opportunity
PIEE #W911S226U4017
Pneumatic, Skid-Mounted Safety Shower and Eyewash Station for Hazardous Locations
Buyer
MICC-Ft Drum
Posted
August 10, 2026
Respond By
August 18, 2026
Identifier
W911S226U4017
NAICS
332913, 333318
This procurement opportunity is issued by W6QM MICC-FT DRUM for the McAlester Army Ammunition Plant in Oklahoma. - The government seeks a pneumatic, skid-mounted safety shower and eyewash station for hazardous locations - ATS EcoTower C1D2/26 is the specified model, but equivalent products are acceptable - Key OEM: ATS (Advanced Technology Solutions) - Product requirements: - Fully compliant with ANSI/ISEAZ358.1 (2014) for emergency eyewash and shower equipment - Certified for Class I, Division 2 hazardous locations - Minimum 325-gallon insulated water tank - Integrated electrical immersion heating system (minimum 1,200 Watts) - Freeze protection down to 0°F - Pneumatically driven transfer pump - Regulated flow rates: shower (≥20 GPM), eyewash (≥0.4 GPM) - Corrosion-resistant, skid-mounted design with stainless steel piping - Operates on standard 120V, single-phase, 60Hz power - Offerors must provide a Material Safety Data Sheet (MSDS) with their submission - 'Or equal' alternatives to the ATS EcoTower C1D2/26 are permitted, provided all technical and safety requirements are met
Description
ATS EcoTower C1D2/26 – Pneumatic, Skid-Mounted Safety Shower and Eyewash Station (or Equal) Primary Purpose: To provide rapid, compliant, and self-contained emergency decontamination (shower and eye/face wash) in remote locations or harsh environments lacking a potable water source, specifically within hazardous areas. ________________________________________ ¿¿¿¿ Core System and Compliance Standards • Safety Compliance: Must be fully compliant with ANSI/ISEAZ358.1 (2014) standards for emergency eyewash and shower equipment, ensuring continuous flow capabilities • Electrical Hazard Classification: Must be certified for Class I, Division 2 (C1D2) hazardous locations to prevent ignition risks in environments where flammable gases or vapors may be present________________________________________ ¿ Water Capacity and Thermal Regulation • Fluid Capacity: Must include an integrated, heavy-duty insulated water storage tank with a minimum capacity of 325 gallons to guarantee a minimum of 15minutes of continuous tepid water flow. • Tepid Water Delivery: Must feature an integrated, electrical immersion heating system (minimum 1,200 Watts) to actively maintain stored water temperatures above the ANSI-mandated minimum of 60°F (15.6°C) in freezing or cold-weather conditions • Freeze Protection: Must utilize a self-regulating heat trace system to protect plumbing and supply lines from freezing down to an ambient operating temperature threshold of 0°F (-17.8°C) _____________________________________¿¿¿¿ Pneumatic Operation and Mechanical Specifications • Pumping System: Must utilize a pneumatically driven transfer pump (rather than electric) to deliver pressurized water to the showerhead and eyewash . This ensures complete spark-free operation in C1D2 zones and allows the unit to safely function during electrical outages via pneumatic backup •Pneumatic Air Source Input: Must support a shop air compressor supply or specialized nitrogen tank supply with an operational pressure range of 60 to 120 PSI (recommended regulator set to 80 PSI) • Flow Rates: • Shower: Must deliver a regulated flow rate of at least 20 GPM (76 LPM) • Eyewash: Must deliver a regulated flow rate of at least 0.4 GPM(1.5 LPM) with an integrated protective dust/debris cover_____________________________________ ¿¿¿¿ Structural and Mounting Specifications • Skid-Mount Design: Must be built on a heavy-duty, corrosion-resistant, powder-coated steel skid frame designed for rapid deployment, positioning by forklift/crane, and high-wind structural stability. • Footprint and Portability: Must maintain a compact, space-saving footprint suitable for deployment in tight industrial spaces, remote airfields, or forward operating environments • Material Durability: All critical external piping and the showerhead assembly must be constructed from durable stainless steel or equivalent corrosion-resistant materials. • Controls and Activation: Must feature a highly visible, easy-to-reach mechanical pull-handle mechanism for instant, hands-free activation of the shower ________________________________________ ¿ Power Requirements •Electrical Input: Must operate on standard, readily available utility or generator power:120V, single-phase, 60Hz, 20-Amp draw (typically utilizing a NEMA 5-20 plug configuration)