Opportunity
SAM #140A1126R0012
Steel Lifting Beam Modification and Fabrication for Headgate Rock Dam (BIA Western Region)
Buyer
Bureau of Indian Affairs Western Region
Posted
August 10, 2026
Respond By
September 10, 2026
Identifier
140A1126R0012
NAICS
332312, 332313, 238120
This opportunity from the Bureau of Indian Affairs (BIA) Western Region seeks fabrication and modification services for steel lifting beam components at the Headgate Rock Dam, Colorado River Agency. - Government Buyer: - Bureau of Indian Affairs (BIA), Western Region, Colorado River Agency, Office of Trust Services Division of Water and Power, Contracting Office (Phoenix, AZ) - OEMs and Vendors: - No specific OEMs or commercial vendors are named; steel and hardware must meet ASTM and AWS standards - Products Requested: - Steel plates, bars, channels, and fabricated assemblies (ASTM A36, A992) - Cap Plate: 1 unit (24" x 10-1/4" x 1/2" A36 Plate) - Cut Plates A & B: 1 unit each (3/8" A36 Bar) - Bent Plate B: 2 units (3/8" A36 Bar) - Top & Bottom Plate: 1 unit (6" x 3/8" A36 Bar) - C Channel: 2 units (C15" x 33.9# x 238" ASTM A36, part number 10-B-11266) - Lifting Plate Assembly: 2 units (Fabricated Plate Assembly ASTM A36, part number 10-B-11264) - End Guide Assembly: 2 units (Fabricated Plate Assembly ASTM A36, part number 10-B-11262) - 6x9 Bar: 2 units (6" x 9" x 3/8" Bar ASTM A36, part number 10-B-11263) - Pin Keeper: 4 units (2" x 10" x 1/4" Plate ASTM A36, part number 10-B-11263) - Pin: 8 units (1-1/2" x 7-5/8" CF Steel, part number 10-B-11263) - Hook Stop: 10 units (11" x 5" x 3/8" Bar ASTM A36, part number 10-B-11263) - Dowell Retainer: 4 units (9" x 6" x 3/8" Bar ASTM A36, part number 10-B-11265) - Dowell Retainer Mounting Plate: 4 units (4-1/2" OD x 1" Wall x 20" Steel Tubing ASTM A36, part number 10-B-11265) - Sling: 1 unit (1-1/4" upper link stock diameter, 3/4 wire rope with IWRC improved steel) - Hook Assembly: 12 units (Fabricated Assembly ASTM A36 and Bronze, part number 10-C-11261) - Tag Line: 1 unit (1000# min. breaking strength, 40' long Dacron) - Additional mounting hardware and washers - Services Requested: - Transport owner-furnished lifting beam to fabrication shop, modify per specifications, and deliver back - Facilitate final test at project site (including crane and operator) - Fabricate steel stoplogs and lifting beam per ASTM/AWS standards, including neoprene rubber seals, stainless steel hardware, and specified painting/coating systems - Unique/Notable Requirements: - All steel and hardware must comply with ASTM and AWS standards - Contractor must provide neoprene rubber seals, stainless steel hardware, and specific painting/coating systems - Final test demonstration required onsite - Compliance with tribal tax and TERO fee requirements - Small business set-aside - Period of Performance: - 365 calendar days from Notice to Proceed; modification period of 21 days after equipment pickup, with additional deadlines for inspection and delivery - Place of Performance: - Headgate Rock Dam, near Parker, Arizona
Description
STOPLOG LIFTING BEAM MODIFICATION PROJECT - Colorado River Agency