Opportunity

SAM #36C24726Q0772

Replacement and Upgrade of Emergency Generators at Carl Vinson VA Medical Center (Buildings 2 & 4)

Buyer

VANCO 7

Posted

August 10, 2026

Respond By

September 14, 2026

Identifier

36C24726Q0772

NAICS

236220, 238210, 238220, 238290

This opportunity is for the replacement and upgrade of emergency generators and associated systems at the Carl Vinson VA Medical Center in Dublin, GA. - Government Buyer: - Department of Veterans Affairs (VA) - Carl Vinson VA Medical Center - Veterans Health Administration - Scope of Work: - Replacement of emergency generators in Buildings 2 and 4 - Installation of new generators, fuel tanks, automatic transfer switches, switchboards, electrical panels, day tanks, and load banks - Provision of a temporary generator during construction - Upgrades to emergency electrical distribution systems, metering, and monitoring - Modifications to electrical rooms, civil site work, physical enclosures, fire alarm and sprinkler systems, and electronic security - Compliance with VA Electrical Design Manual, Physical Security requirements, and all federal, state, and local regulations - Adherence to Davis-Bacon Act wage rates for Laurens County, GA - OEMs and Vendors: - No specific OEMs or part numbers are mentioned in the solicitation or attachments - Notable Requirements: - Project must be completed within 455 calendar days from Notice to Proceed - Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside - Firm-fixed-price contract - Submission of bid, performance, and payment bonds required - Quality control, safety, and seismic restraint requirements - Upgrades must meet VA and federal construction standards

Description

DEPARTMENT OF VETERANS AFFAIRS Network Contracting Office 7 (NCO 7) Carl Vinson Veterans' Administration Medical Center 1826 Veterans Blvd, Dublin, GA 31021 COMBINED SYNOPSIS/SOLICITATION Commercial Construction Services | FAR Parts 12 and 36 TOTAL SDVOSB SET-ASIDE | LPTA BASIS FOR AWARD Solicitation Number: 36C24726Q0772 Project Number: 557-23-103 Project Title: Replace Building 2 and Building 4 Generators Issuing Office: NCO 7, Carl Vinson VAMC, Dublin GA Set-Aside: Total Service-Disabled Veteran-Owned Small Business (SDVOSB) -- 38 U.S.C. 8127 NAICS Code: 236220 -- Commercial and Institutional Building Construction ($45 Million Size Standard) Contract Type: Firm-Fixed-Price (FFP) -- FAR 36.207 Acquisition Method: FAR Part 12 (Commercial Services) + FAR Part 36 (Construction) Disclosure of Magnitude: Between $5,000,000 and $10,000,000 (VAAR 836.204 (f)) Period of Performance: 455 Calendar Days from Notice to Proceed (NTP) Basis for Award: Lowest Price Technically Acceptable (LPTA) Site Visit: Strongly Encouraged — 18 August 2026 at 1000 EST - Location: Dublin VA Medical Center Lobby, 1826 Veterans Blvd, Dublin, GA 31021. If unable to locate, contact Sara Stover at 478-272-1210 x72623 RFI Questions Due: 25 August 2026 at 1300 EST -- Submit via email to the Contracting Officer. No telephone inquiries will be accepted. Quote Response Deadline: 14 September 2026 at 1300 EST -- Submit via email to the Contracting Officer at Zaire.Naylor@VA.GOV. Late quotes will not be accepted. Contracting Officer: Zaire Naylor — Zaire.Naylor@va.gov This is a combined synopsis and solicitation for commercial construction services prepared in accordance with FAR Subpart 12.202 and FAR Part 5. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued separately. This solicitation is set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) pursuant to 38 U.S.C. 8127. PART 1 — COMBINED SYNOPSIS (SAM.GOV POSTING LANGUAGE) 1.1 Project Description and Disclosure of Magnitude The Department of Veterans Affairs (VA), Network Contracting Office 7 (NCO 7), Carl Vinson Veterans' Administration Medical Center, 1826 Veterans Blvd, Dublin, GA 31021, is soliciting quotes for construction services to replace the Generators in Building 2 and Building 4. The project number for this requirement is 557-23-103. Disclosure of Magnitude (FAR 36.204(g)): The estimated magnitude of this construction project is BETWEEN $5,000,000 AND $10,000,000. This disclosure is provided in accordance with FAR 36.204. The Government's estimate is not disclosed, and the estimated price range does not constitute a limitation on any price the Government will accept. Work will include but is not limited to a temporary generator, replacement fuel tanks, installation of new generators and all associated automatic transfer switches, switchboards, electrical panels, day tanks, load banks, civil site work, physical enclosures, fire alarm and sprinkler modifications, and electronic security based on provided A/E design drawings and specifications. All work will be done in compliance with Federal, State, and local regulations. 1.2 Set-Aside Status and Eligibility This acquisition is a TOTAL SDVOSB SET-ASIDE pursuant to 38 U.S.C. 8127-8128 (Veterans First Contracting Program). The VA Rule of Two has been satisfied. Quotes from firms that are not verified SDVOSBs through the SBA VetCert program at the time of quote submission will not be evaluated and will be rejected as ineligible. Verified SDVOSB status required through SBA VetCert at: https://veterans.certify.sba.gov NAICS Code: 236220 — Commercial and Institutional Building Construction Small Business Size Standard: $45.0 million average annual receipts Limitations on Subcontracting (FAR 52.219-14): Prime must perform at least 15% of the contract cost (excluding materials) with its own employees. 1.3 Basis for Use of FAR Part 12 A commercial item determination has been made pursuant to FAR 12.101 and FAR 2.101. Construction of the type required here is a commercial service customarily available in the commercial marketplace. This solicitation uses FAR Part 12 streamlined procedures in conjunction with FAR Part 36 construction requirements. All FAR Part 36, Davis-Bacon Act (FAR 22.4), and VA-specific requirements remain mandatory. 1.4 Contract Type Firm-Fixed-Price (FFP) per FAR 36.207. Award of a single contract is intended. 1.5 Quote Submission Quotes must be submitted via email to the Contracting Officer Zaire.Naylor@va.gov by 14 September 2026 at 1300 EST. Late quotes will not be accepted. Quotes submitted by any other method will not be considered. PART 2 — CONTRACT LINE ITEMS (CLINs) CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE 0001 Project Number 557-23-103: Work will include but is not limited to temporary generator, replacement fuel tanks, installation of new generators and all associated automatic transfer switches, switchboards, electrical panels, day tanks, load banks, civil site work, physical enclosures, fire alarm and sprinkler modifications, and electronic security based on provided A/E design drawings and specifications. All work will be done in compliance with Federal, State, and local regulations within 455 Calendar Days from NTP. 1 Job (Lump Sum) N/A $________ TOTAL PRICE (CLIN 0001) $________ NOTE: The price for CLIN 0001 is the total all-inclusive lump sum price to complete all work described in the Statement of Work, construction drawings, and specifications. The price must include all labor (at Davis-Bacon prevailing wage rates per applicable Wage Determination), materials, equipment, overhead, profit, bid bond, performance bond, payment bond, insurance, and all other direct and indirect costs required to complete the project. PART 3 — STATEMENT OF WORK Project 557 23 103 includes providing a temporary generator, replacing fuel tanks, installing new generators, and adding all required automatic transfer switches, switchboards, panels, day tanks, load banks, civil site work, enclosures, fire alarm and sprinkler updates, and electronic security per A/E drawings and specifications. All work must follow Federal, State, and local regulations and be completed within 455 calendar days from NTP. PART 4 — INSPECTION AND ACCEPTANCE Inspection and acceptance will be performed by the designated COR per FAR 52.246-12 (Inspection of Construction). The COR may inspect the work and direct correction of deficiencies but does NOT have authority to modify the contract, approve scope changes, or direct work beyond the contract scope. Upon substantial completion, the CO will issue a Substantial Completion certificate. Final acceptance will follow after all punch list items are corrected and the final inspection is approved. PART 5 — DELIVERABLES AND PERIOD OF PERFORMANCE 5.1 Period of Performance 455 calendar days from Notice to Proceed (NTP). NTP will be issued by the CO after bonds are received and verified, and after the preconstruction conference is scheduled. 5.2 Place of Performance Carl Vinson VA Medical Center, 1826 Veterans Blvd Dublin, GA 31021 5.3 Required Deliverables For a complete list of required deliverables, due dates, and submission instructions, see the attached Specifications, Drawings and Statement of Work. Key deliverables include the project schedule, Accident Prevention Plan, Contractor Quality Control Plan, ICRA/ILSM plan, shop drawings, weekly progress reports, certified payrolls, as-built/record drawings, and equipment O&M manuals. PART 6 — CONTRACT ADMINISTRATION Role Name / Contact Authority Contracting Officer (CO) Zaire Naylor Zaire.Naylor@va.gov Full contractual authority. Only the CO may modify the contract, authorize changes, or approve deviations from scope. Contracting Officer's Representative (COR) Sara Stover Sara.Stover@va.gov Desk: 478-272-1210 x72623 Technical oversight and surveillance only. May inspect, accept, and direct correction of deficiencies. May NOT modify contracts, approve changes, or authorize work beyond scope. Invoice submission: Invoices shall be submitted through the VA's invoice portal (OB10/Tungsten) or as directed in the contract award. Payment will be made per FAR 52.232-5 (Payments Under Fixed-Price Construction Contracts). Progress payments are authorized in accordance with the Schedule of Values to be submitted within 15 calendar days of NTP. Final payment will not be made until all punch list items are closed and the CO grants final acceptance. PART 7 — SPECIAL CONTRACT REQUIREMENTS 7.1 Davis-Bacon Act — Prevailing Wage Rates This contract is subject to the Davis-Bacon Act (40 U.S.C. 3141-3148) and FAR 22.4. All laborers and mechanics employed in construction under this contract shall be paid not less than the prevailing wage rates and fringe benefits outlined in the applicable Department of Labor Wage Determination for the county in which work is performed. The applicable Wage Determination is incorporated by reference in the contract. The contractor shall obtain the current Wage Determination from SAM.gov (https://sam.gov/content/wage-determinations) and verify currency prior to quote submission. Applicable clause: FAR 52.222-6 (Construction Wage Rate Requirements) Certified Payrolls: Submitted weekly on DOL Form WH-347 Posting: Contractor shall post the Wage Determination at the job site 7.2 Bonds (Miller Act — 40 U.S.C. 3131) Because the estimated value of this contract exceeds $150,000, the following bonds are required: Bond Type Amount Form Due Bid Bond / Bid Guarantee 20% of quoted price, NTE $3,000,000 SF 24 Submitted WITH Quote — missing bid bond = NON-RESPONSIVE Performance Bond 100% of contract value SF 25 10 Days after Notice of Award Payment Bond 100% of contract value SF 25-A (same surety as Performance Bond) 10 Days after Notice of Award The awardee shall submit the Performance Bond (SF 25) and Payment Bond (SF 25-A) no later than 10 calendar days after Notice of Award. The Contracting Officer will not issue the Notice to Proceed until both bonds are received, reviewed, and the surety is verified against Department of the Treasury Circular 570 (FAR 28.102) 7.3 Site Visit A pre-bid site visit is strongly encouraged but not mandatory. Interested quoters should meet at Carl Vinson VA Medical Center, 1826 Veteran Blvd, Dublin, GA 31021, building 29, conference room. If unable to locate the meeting point, contact Sara Stover at (478) 272-1210 X72623. No questions will be answered during the site visit. All questions must be submitted via email to the Contracting Officer Zaire.Naylor@va.gov. The contractor is responsible for independently assessing site conditions and including all related costs in the price. (FAR 52.236-3) 7.4 Preconstruction Conference The awardee will be required to attend a preconstruction conference with the CO and COR prior to NTP. The conference will address project plans, schedule requirements, submittals, utility shutdown procedures, and all other pre-performance requirements. 7.5 VA-Specific Requirements The contractor shall comply with VA Directive 0710 (Personnel Suitability and Security Program) for all personnel requiring access to VA facilities or information systems. The contractor shall comply with all applicable Joint Commission standards related to infection control in occupied healthcare construction environments. All work is subject to VA Facilities Management review and approval per VAHCS facility standards. CPARS: A Contractor Performance Assessment Report will be completed in the Federal Awardee Performance and Integrity Information System (FAPIIS/CPARS) upon contract completion per FAR 42.1503. PART 8 — CONTRACT CLAUSES The clauses and provisions applicable to this contract are set forth below and in Contract Clauses and Provisions Attached. Clauses incorporated by reference have the same force and effect as if outlined in full text. Full text of FAR clauses is available at https://acquisition.gov; VAAR clauses at https://www.acquisition.gov/vaar. 8.1 52.212-4 — Terms and Conditions — Commercial Products and Commercial Services (Construction Version) — FULL TEXT FAR 52.212-4, Terms and Conditions — Commercial Products and Commercial Services (Construction Version) (Deviation), is incorporated herein in full text. This is the construction-tailored version per FAR 12.205(b)(3) and the August 2025 RFO Class Deviation. See Attachment 8 — Contract Clauses and Provisions. 8.2 Additional Required Clauses Clause Title Status/Deviation 52.203-17 Contractor Employee Whistleblower Rights (NOV 2023) Applicable 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) Applicable <!-- Additional clauses omitted for brevity --> 8.3 FAR Part 36 Construction Clauses Clause Title Notes 52.236-2 Differing Site Conditions (APR 1984) (DEVIATION AUG 2025) Full text and attached <!-- Additional clauses omitted for brevity --> 8.4 Labor and Safety Clauses Clause Title Notes 52.222-4 Contract Work Hours and Safety Standards — Overtime Compensation (MAY 2018) (DEVIATION NOV 2025) By reference — contract >$200K <!-- Additional clauses omitted for brevity --> 8.5 Bond, Payment, and Financial Clauses Clause Title Notes 52.228-1 Bid Guarantee (SEPT 1996) Full text in and — SF 24, 20% NTE $3M <!-- Additional clauses omitted for brevity --> 8.6 General Compliance and Security Clauses Clause Title Notes 52.203-3 Gratuities (APR 1984) By reference <!-- Additional clauses omitted for brevity --> 8.7 VAAR / VA-Specific Clauses Clause Title Notes VAAR 852.201-70 Contracting Officer s Representative (DEC 2022) By reference <!-- Additional clauses omitted for brevity --> PART 9 — REPRESENTATIONS AND CERTIFICATIONS By submitting a quote, the quoter represents and certifies that: The quoter's SAM registration must be active at the time of award. The quoter is a verified SDVOSB through the SBA VetCert program (https://veterans.certify.sba.gov) and will remain verified through contract performance. The quoter qualifies as a small business under NAICS 236220 ($45.0M size standard). The quoter is not listed on the System for Award Management (SAM.gov) debarment and suspension list and will remain in good standing through contract performance. The quoter's price includes all Davis-Bacon prevailing wage rates for the appropriate County, and all required fringe benefits. The quoter has reviewed the solicitation, all Attachments, the construction drawings, and the applicable specifications, and the price submitted reflects a complete understanding of the scope of work. The quoter attended the pre-bid site visit OR has independently assessed site conditions and accepts responsibility for all site-related pricing risks. The required bid guarantee is enclosed with this quote. The information and representations in this quote are accurate, complete, and current as of the date of submission. PART 10 — BASIS FOR AWARD AND SUBMISSION REQUIREMENTS This solicitation is set aside 100% for verified SDVOSBs. Quoters must be registered in SAM.gov and verified through SBA VetCert at the time of submission and at the time of award. Include an acknowledgment or signed copy of all amendments. Address all factors completely. Incomplete submissions will be rejected. Quote should consist of a Technical Submission (Volume I) and a Price Submission (Volume II), as described below. TAB A: General Information Cover page with Solicitation Number (36C24726Q0772) and Project Title (Replace Building 2 & Building 4 Generators) Signed copy of all Amendments Current SBA VetCert SDVOSB Certification SAM UEI Number Bid Bond (SF 24) — 20% of quoted price, NTE $3,000,000. Missing bid bond = non-responsive. EMR Documentation — Official letter from workers' compensation carrier on carrier letterhead, covering 3 most recent policy years, dated within 12 months. EMR must be 1.0 or below. If above 1.0, submit: (1) carrier explanation, (2) corrective safety program, (3) safety improvement data, and (4) third-party safety certification. Self-insured firms obtain rating through NCCI (Form ERM-6). Signed VAAR 852.219-75 — VA Notice of Limitations on Subcontracting Certificate VETS-4212 Filing Confirmation TAB B: Technical Submission — Volume I (30-Page Max) Factor 1 Construction Approach: Describe all work the prime contractor intends to self-perform, including project management and supervision, demolition, site work, medium and low voltage electrical work, generator install, fuel system work, controls integration, etc. as applicable. Describe the procurement strategy for generators, automatic transfer switches, fuel system components, switchboards, load banks, and other long-lead electrical equipment. Describe methods used to mitigate supply chain delays while maintaining the required performance period. Describe the Quality Control (CQC) System and Site Safety & Health Plan that will be implemented to perform replacement of emergency generators in an occupied medical facility while maintaining continuous operation of critical building systems. Include ICRA and ILSM implementation details. Quote shall describe methods to maintain compliance with NFPA 70, 70E, 99, 101, 110, and applicable VA design standards Describe the superintendent's daily management approach for coordinating construction activities within an occupied healthcare facility including daily coordination, utility outage planning, work sequencing, resolution of unforeseen conditions, and verification of system readiness before scheduled outages. Describe approach to planning, coordinating, minimizing, and executing electrical utility outages required for the work. Include outage planning process, contingency planning, coordination with hospital engineering staff, notification procedures, required approvals, expected outage durations, and methods to minimize patient care impacts. Describe how electrical, mechanical, structural, controls, fuel system, testing and commissioning subcontractors will coordinate activities to minimize disruption to hospital operations. Include coordination of shutdowns, testing, inspections, startup activities, and commissioning. Factor 2 Conceptual Schedule Management: Provide a conceptual construction schedule demonstrating the quoter's understanding of the project scope, phasing, sequencing, and overall execution plan. The schedule shall identify all major construction activities and milestones necessary to complete the work within the required contract performance period and shall include activity durations in calendar days. At a minimum, the schedule shall identify procurement of long-lead equipment, submittal review periods, demolition, utility outage planning and execution, temporary power activities (if applicable), generator installation, fuel system work, electrical tie-ins, testing, startup, commissioning, training, and project closeout. The conceptual schedule shall identify the critical path and be submitted as a PDF depicting activity names, durations, planned start and finish dates, predecessor and successor relationships, and any schedule constraints or assumptions used in developing the schedule. For evaluation purposes only, quote shall assume a project start date of November 1, 2026. This date is provided solely to establish a common basis for evaluating the proposed schedule; it does not represent the anticipated contract award date, Notice to Proceed, or any other contractual milestone. The conceptual schedule is intended solely for quote evaluation to demonstrate the quoter's understanding of the work; it does not satisfy the post-award scheduling requirements specified elsewhere in the contract. Factor 3 Staffing and Management Plan to Include: Provide all four items listed below. Omission of any item will render the quote UNACCEPTABLE. Management organization chart of proposing firm (prime contractor) and Key Staff including Construction Project Manager, Quality Control Manager (CQC System Manager), Site Superintendent, and Site Safety & Health Officer. Identify all intended subcontractors performing specialized work, including electrical controls, fuel systems, and site work. For each subcontractor, describe its proposed scope of work, technical responsibilities, applicable certifications or qualifications, and coordination methods necessary to successfully perform work within an occupied healthcare facility while maintaining continuity of critical operations. Describe the communication and coordination procedures between the prime contractor, specialized subcontractors, Government personnel, and facility operations staff during activities affecting the emergency power system. Include responsibility assignments for outage planning, integrated system testing, startup, and restoration of service. Factor 4 — Safety Performance (EMR) | PASS/FAIL: EMR documentation submitted in TAB A is the basis for this factor evaluation. TAB C: Price Submission — Volume II (30-Page Max) Completed and signed RFQ Quotation Form attachment including vendor info, CLIN 0001 price, and all certifications. This is your binding quote. Completed Itemized Cost Breakdown Worksheet (Attached). All division totals must sum to the CLIN 0001 lump sum price. All prices must be Firm-Fixed-Price. CLIN 0001 must include all labor (Davis-Bacon prevailing wages — Laurens County, GA, materials, equipment, bonds, insurance, overhead, and profit for the full 455-day period of performance. Price breakdown must show at least 15% of personnel costs performed by the prime's own employees per VAAR 852.219-75. Government systems (OSHA/EPA databases, CPARS, SAM.gov) will be used for Responsibility Determination. Determination is made only for the apparent awardee. Failure to comply with ALL criteria and submit ALL required documentation will result in rejection without evaluation. Evaluation Method This is a competitive RFQ using Lowest Price Technically Acceptable (LPTA) procedures under FAR Parts 12 and 36. The Government will award a single firm-fixed-price contract to the lowest-priced quoter rated ACCEPTABLE on all four technical factors. Quotes are evaluated in ascending price order. The Government intends to award without exchanges — submit your best and final quote. Before technical evaluation, the Government will verify minimum submission requirements. Quotes missing required documents will be rejected without evaluation. All quoters must meet every listed technical factor to be considered technically acceptable. Quotes will be evaluated on a pass/fail basis for each item. Failure to fully comply with any single requirement under Factor 1 (Construction Approach), Factor 2 (Conceptual Schedule Management), Factor 3 (Staffing and Management Plan), or Factor 4 (Safety Performance) will result in the entire quote being deemed unacceptable and removed from further consideration. Price: The total price will be evaluated for fairness and reasonableness. Award will be made to the lowest-priced, technically acceptable quote that is determined fair and reasonable. This is a Firm-Fixed-Price acquisition, and all associated risk rests with the contractor.

View original listing