Opportunity

SAM #140L1226Q0036

BLM Doyle Fire Station Construction and Perimeter Fence Replacement

Buyer

BLM California

Posted

August 10, 2026

Respond By

September 05, 2026

Identifier

140L1226Q0036

NAICS

238990, 238190, 238290, 238160, 236210, 238220, 238120

This opportunity involves the Bureau of Land Management (BLM) California State Office seeking construction and fencing services for the Doyle Fire Station in Doyle, CA. - Government Buyer: - Department of the Interior, Bureau of Land Management (BLM), California State Office, Business Services Branch - BLM National Operations Center, Denver Federal Center - Doyle Interagency Fire Station - OEMs and Vendors Mentioned: - KOHLER (plumbing fixtures) - JUST (kitchen sinks) - FIAT (utility and mop sinks) - ELKAY (water coolers) - WOODFORD (hose bibbs) - OATEY (outlet boxes) - J.R. SMITH (floor drains, wall cleanouts) - WATTS (mixing valves, expansion tanks, floor sinks) - PPP (water hammer arrestors) - COXREELS (air hose reels) - RHEEM (water heaters) - QUINCY (air compressors) - TOWLE WHITNEY (booster pumps, future provision) - Chicago Faucet (utility sink faucets) - Products/Services Requested: - Construction of an 8,621 GSF fire station with engine bays, administrative areas, shop, and mezzanine - Site improvements: gravel drive, fencing, gates, infrastructure upgrades - Replacement of approximately 1,377 feet of galvanized steel chain-link perimeter fencing with 3-strand barbed wire and a manual rolling gate - Plumbing, HVAC, electrical, and landscape work including: - KOHLER water closets, lavatories, urinals, showers - JUST and FIAT sinks - ELKAY electric water coolers - WOODFORD hose bibbs - OATEY outlet boxes - J.R. SMITH drains and cleanouts - WATTS mixing valves, expansion tanks, floor sinks - PPP water hammer arrestors - COXREELS air hose reels - RHEEM electric water heaters - QUINCY air compressors - TOWLE WHITNEY booster pump (future, not in contract) - Chicago Faucet utility sink faucets - Unique or Notable Requirements: - Fencing must be galvanized steel chain-link with 3-strand barbed wire angled outward, including a manual rolling gate - Contractor must remove and dispose of existing fencing and debris, trim or remove interfering trees, and comply with environmental and safety regulations - Construction must comply with ADA, NFPA, and energy codes - Deliverables include product specifications, quality control and safety plans, and progress photos - Contract duration is 90 calendar days after notice to proceed, with strict scheduling and coordination requirements

Description

DOYLE FS - PERIMETER FENCE REPLACEMENT

View original listing