Opportunity

SAM #W50S6Y26PA003

Procurement of Stationary Nitrogen Generator System for USPFO FLANG 125

Buyer

U.S. Army National Guard Bureau (NGB)

Posted

August 10, 2026

Identifier

W50S6Y26PA003

NAICS

333912, 335312

The United States Department of Defense, Department of the Army, National Guard Bureau, JFHQ USPFO FL, USPFO FL PROCUREMENT, W7M2 USPFO ACTIVITY FLANG 125 is seeking to procure a Stationary Nitrogen Generator System. - Government Buyer: - Department of Defense, Department of the Army, National Guard Bureau, JFHQ USPFO FL, USPFO FL PROCUREMENT, W7M2 USPFO ACTIVITY FLANG 125 - Products/Services Requested: - Stationary Nitrogen Generator System (self-contained, outdoor-rated) - Integrated air compressor - Nitrogen purity: at least 99.5% - Flow rate: 9 to 17 SCFM - Outlet pressure: 3,000 to 5,000 PSIG (boosted) - Storage: minimum 912 cubic feet at 3,000 to 5,000 PSI (two-bottle indoor storage system) - Electrical: 480 VAC, 3-Phase, 60 Hz - Unique/Notable Requirements: - System must be suitable for continuous outdoor operation - Delivery required within 120 calendar days after award - Government acceptance contingent on 100% on-site testing by government personnel - No specific OEMs, part numbers, or purchase quantities are specified in the solicitation.

Description

Stationary Nitrogen Generator System

The contractor shall provide a self-contained, outdoor-rated Stationary Nitrogen Generator System meeting the following minimum specifications:

Environmental: Designed for continuous outdoor operation in all standard weather conditions. Configuration: Self-contained unit including an integrated air compressor. Purity & Flow Rate: >= 99.5% dry nitrogen at a rate of 9 to 17 SCFM. Output Pressure: Boosted outlet pressure of 3,000 to 5,000 PSIG. Storage Capacity: Minimum 912 cubic feet of ready-to-use nitrogen storage at 3,000 to 5,000 PSI (provided via an indoor-installed, two-bottle storage system). Electrical: 480 VAC, 3-Phase, 60 Hz.

2. Delivery & Acceptance

Delivery Schedule: 120 Calendar Days After Receipt of Award (ARO) or sooner. Government Acceptance: Final acceptance is contingent upon 100% on-site testing of all delivered materials by Government personnel.

View original listing