Opportunity

Winter Park Opengov #456999-1-54-01

Stirling Avenue Bridge Replacement for City of Winter Park, FL

Posted

July 09, 2026

Respond By

August 21, 2026

Identifier

456999-1-54-01

NAICS

237310, 237990, 238190

This opportunity is for the replacement of the Stirling Avenue Bridge in Winter Park, Florida, managed by the City of Winter Park's Public Works & Transportation Department. - Government Buyer: - City of Winter Park, Public Works & Transportation Department - Project Scope: - Demolition of the existing timber box culvert - Construction of a new single-span cast-in-place concrete flat slab bridge - Installation of sheet pile retaining wall, rubble riprap, stormwater piping - Utility coordination, sidewalk modifications for ADA compliance - Minor roadway reconstruction, curb and gutter installation - Maintenance of traffic, erosion control, clearing and grubbing, sod restoration - Products/Materials Requested: - Mobilization (1 unit, 101-1) - Maintenance of traffic (1 unit, 102-1) - Sediment barrier (613 units, 104-10-3) - Floating turbidity barrier (70 units, 104-11) - Inlet protection system (4 units, 104-18) - Clearing & grubbing (0.25 units, 110-1-1) - Removal of existing concrete (13 units, 110-4-10) - Regular excavation (13 units, 120-1) - Embankment (13 units, 120-6) - Type B stabilization (610 units, 160-4) - Optional base, base group 09 (610 units, 285-709) - Asphalt concrete friction course (67 units, 337-7-83) - Inlets, curb, type 10 (<10', 1 unit, 425-12-11) - Inlets, curb, type P-4 (<10', 1 unit, 425-13-41) - Pile inspection, driven pile (8 units, 455-20-1) - Steel piling, HP 14X89 (680 units, 455-35-6) - Riprap, rubble, F&I, ditch lining (116 units, 530-03-04) - Bedding stone (125 units, 530-074) - Concrete curb & gutter, type F (395 units, 520-1-10) - Concrete curb, type D (41 units, 520-2-4) - Services Requested: - Demolition of existing timber box culvert - Construction of new bridge - Utility coordination - Sidewalk modifications and ADA compliance - Minor roadway reconstruction - Erosion control and sod restoration - Unique/Notable Requirements: - Contractors must be prequalified by the Florida Department of Transportation in drainage, minor bridges, and retaining wall/underground utilities - Strict prequalification and electronic bid submission required - Liquidated damages of $1,685 per day for delays - No specific OEMs or vendors are mentioned in the solicitation.

Description

This solicitation is for the replacement of the Stirling Avenue Bridge located approximately 200 feet east of Lakeview Drive in Winter Park, Florida. The project requires contractors to be prequalified by the Florida Department of Transportation in specific work classes including drainage, minor bridges, and retaining walls. The scope includes various construction services such as mobilization, maintenance of traffic, clearing and grubbing, excavation, embankment, stabilization, asphalt concrete, inlets, pile inspection, steel piling, riprap, bedding stone, and concrete curb and gutter. Liquidated damages are set at $1,685 per day for delays in substantial or final completion. Bids must be submitted electronically via the City of Winter Park Procurement Portal by August 21, 2026.

View original listing