Opportunity
SAM #FA252126QB089
Installation and Certification of Centralized Compressed Air and Grade D Breathing Air System for C-130 Hangar
Buyer
45th Logistics Group
Posted
August 07, 2026
Respond By
August 20, 2026
Identifier
FA252126QB089
NAICS
238220, 333912, 541690, 238290, 541380
This opportunity is issued by the Department of the Air Force, Space Systems Command, FA2521 45 CONS PK office at Patrick Space Force Base, Florida, for the installation and certification of a centralized compressed air and Grade D breathing air system for a new C-130 hangar. - Government Buyer: - Department of Defense, Department of the Air Force, Space Systems Command - Office: FA2521 45 CONS PK, Patrick Space Force Base, Florida - Products and Equipment Requested: - Oil-free rotary screw air compressor (variable speed drive, 500-600 CFM at 125 PSI) - 600-gallon wet/dry receiver tank - Refrigerated air-drying system and coalescing/particulate filters (ISO 8573-1 Class 1-2-1) - Breathing air purification manifolds (for future paint and blast booths, compatible with Vortex cooling tubes) - Multi-stage filtration and continuous CO monitors (audible/visual alarms at 10 ppm) - Services Requested: - Complete installation, connection, commissioning, and certification of the air system - Third-party laboratory air quality testing (OSHA Grade D) - On-site support for 45th Bioenvironmental Engineering survey - Preventative maintenance for 12 months (quarterly, semi-annual, annual visits) - Training for up to five Air Force personnel on system operation and maintenance - Unique/Notable Requirements: - System must meet OSHA Grade D air standards and pass 45th Bioenvironmental Engineering survey - All equipment must be oil-free and sized for future expansion (paint/blast booths) - Delivery and installation required within 60 days after contract award - One-year comprehensive warranty and maintenance included - No specific OEMs or part numbers are named; the procurement is open to commercial solutions meeting the technical requirements.
Description
The government requires the installation and certification of a centralized compressed air and Grade D breathing air system for the new single-bay C-130 hangar at Patrick Space Force Base.
See attachment 1 - PWS for full project description.