Opportunity
City of Temple Terrace Demandstar #26-005
CDBG 54th Street Water Main Improvement Project – New Water Main Installation
Posted
August 07, 2026
Respond By
September 17, 2026
Identifier
26-005
NAICS
237110, 237990
The City of Temple Terrace, FL is seeking proposals for the CDBG 54th Street Water Main Improvement Project. - Scope of work includes: - Installation of a new 6-inch water main along 54th and 55th Street - Approximately 800 feet of 6-inch fusible PVC water main installed via horizontal directional drilling (HDD) - Connection from the existing 6-inch main on East Mission Hills Avenue to new mains on both streets - Installation of fittings, gate valves, fire hydrant assembly, and cut-in-tee - Disinfection, sampling, and testing of the new water main system - Relocation and installation of twelve new far side and twelve near side dual potable water services on private property to connect residential customers to the new main - No specific OEMs or vendors are named in the solicitation - Notable requirements: - Use of HDD for water main installation - Connection of residential services to the new main in the public right-of-way
Description
The solicitation is for the CDBG 54th Street Water Main Improvement Project in Temple Terrace, FL. The project involves installing a new 6-inch water main on 54th and 55th Street, connecting from the 6-inch main on East Mission Hills Avenue to new mains on both streets. The work includes approximately 800 feet of HDD 6-inch fusible PVC water main, fittings, gate valves, fire hydrant assembly, cut-in-tee, disinfection, sampling, testing, and other appurtenances. Additionally, twelve new far side dual potable water services and twelve near side dual water services will be relocated and installed on private property to connect residential customers to the new water main in the public right-of-way. A non-mandatory pre-bid conference will be held virtually via Microsoft Teams.