Opportunity

SAM #1240LT26Q0107

Crystal Lakes Water and Septic System Upgrades for USDA Forest Service

Buyer

USDA Forest Service

Posted

August 07, 2026

Respond By

September 15, 2026

Identifier

1240LT26Q0107

NAICS

237110, 238220, 238210, 238910

This opportunity is for the Crystal Lakes Water and Septic Resuscitation Project, managed by the USDA Forest Service in Colorado. - Government Buyer: - United States Department of Agriculture (USDA) Forest Service, Region 2, Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands, Leadville Ranger District - OEMs and Vendors: - Goulds (well pump, model 13GS10412C) - Grundfos (Hydros MPC 2 CRE 3-11 boost pump) - Products/Services Requested: - Installation of approximately 900 feet of 2-inch HDPE waterline (trenching, directional drilling, boring, and sleeving under Colorado Highway 24) - New well pump (Goulds model 13GS10412C or equal) with drop pipe, electrical, and controls - Two water storage tanks (minimum 460 gallons each) with floats - Grundfos Hydros MPC 2 CRE 3-11 dual stage boost pump (30 GPM at 100 psi) with integrated controls and diaphragm tank - Complete replacement of septic systems for multiple buildings (Dwelling 1, Dwelling 2, Bunkhouse, Shop), including new sewer lines, soil treatment areas, and septic tanks (1500-gallon and 1000-gallon) - Electrical upgrades: meter relocation, underground service lines, panel upgrades, and support for septic and booster pump systems - Site work: demolition, grading, erosion control, removal of existing asphalt, installation of 330 tons of road aggregate, and new gate installation - Subsurface Utility Engineering (SUE) and CDOT Special Use Permit for utility crossing - Unique/Notable Requirements: - All work must comply with Davis Bacon wage determinations and bonding requirements - Subsurface Utility Engineering and CDOT permitting are required for waterline crossing under a state highway - Project is a small business set-aside under NAICS 237110 - Performance period is 90 days after notice to proceed, with possible winter work interruptions - Specific equipment models are listed but allow for "or equal" substitutions - Work includes both water and septic system upgrades for multiple structures on site

Description

This project involves installing a new 2-inch HDPE waterline beneath Colorado Highway 24, including completing all Subsurface Utility Engineering required for CDOT permitting. Work includes connecting the new waterline from Dwelling 1 to the existing distribution system, replacing the well pump to provide a 15 GPM supply, installing a dual‑stage booster pump and basement water storage, and performing associated electrical upgrades such as relocating meters, burying service lines, upgrading panels, and supporting septic and booster pump systems. The project also replaces multiple septic systems serving the Blue House, Brown House, Bunkhouse, and Shop, installs new sewer and dosing infrastructure, and includes asphalt removal along with new road and gate installation.

View original listing