Opportunity
My Florida Marketplace #FDVA-ITB-27-002B
Boiler Replacement at Emory L. Bennett State Veterans’ Nursing Home (Lochinvar Boiler #2)
Posted
August 06, 2026
Respond By
February 01, 2027
Identifier
FDVA-ITB-27-002B
NAICS
238220, 238290
The Florida Department of Veterans' Affairs (FDVA) is seeking bids for the replacement of Boiler #2 at the Emory L. Bennett State Veterans’ Nursing Home in Daytona Beach, Florida. - Government Buyer: - Florida Department of Veterans' Affairs (FDVA), Mary Grizzle State Office Building - OEMs: - Lochinvar (new boiler to be installed) - H.B. Smith (existing boiler to be removed) - Products/Services Requested: - Removal of existing H.B. Smith Series 28A-8 boiler (CRN# D-605, Serial# N92-1101) - Supply and installation of 1 Lochinvar CHN2072-M13 Copper-Fin gas boiler (84% thermal efficiency, electronic temperature control, stainless steel burners, 10-year heat exchanger warranty) - Reconnection of piping and flue gas piping, electrical wiring, replacement of pipe insulation - Leak checks, system startup, and cleanup - Staff training on the new boiler system - Proper disposal of all project-related waste - One annual system inspection, including testing and repairs - Notable Requirements: - All labor, equipment, materials, and supplies must be provided by the contractor - Project must be completed within 120 calendar days from contract execution - No contract renewals - Warranty coverage for two years from final acceptance, with a 10-year limited warranty on the heat exchanger
Description
The Florida Department of Veterans' Affairs (FDVA) is soliciting bids for the replacement of Boiler #2 at the Emory L. Bennett State Veterans Nursing Home in Daytona Beach, FL. The contractor will be responsible for removing the existing boiler, installing a new Lochinvar copper-fin gas boiler, reconnecting piping and flue gas piping, wiring electrical connections, replacing pipe insulation, and starting up the pump and boiler. Additionally, the contractor must provide staff training, proper disposal of project-related waste, and one annual system inspection including testing and repairs. The contract term is 120 days from full execution.