USDA Forest Service Solicits Water Leak Repair and System Upgrades at Tonto Basin Ranger District

Buyer

USFS CSA Southwest Area 7

Posted

August 06, 2026

Respond By

September 07, 2026

Identifier

127EAX26Q0087

NAICS

238220, 237110, 221310

The USDA Forest Service, Tonto National Forest, is seeking a contractor to repair and upgrade its drinking water distribution system at the Tonto Basin Ranger District. - Government Buyer: - USDA Forest Service, Southwest Region, Tonto National Forest - Tonto Basin Ranger District - Key contacts: Troy McCullough (Contracting Officer), Kossigan Apedjinou (Project Manager/COR) - Products and Services Requested: - Repair of known leaks in the drinking water network across multiple campgrounds (Cholla, Grapevine, Burnt Corral, Chipmunk) - Relocation of recreation hydrants from secondary pipes to main lines (2 base, 1 optional) - Leak repairs under and outside of asphalt pavement (multiple locations, up to 2 base and 2 optional) - Abandonment of leaking pipes in place - Installation of one priority valve and up to three pressure reduction valves at specified locations - Replacement of existing water pipe with Schedule 4 PVC (up to 100 linear feet, optional) - Asphalt restoration after repairs - Mobilization, including bonding, permits, and preparatory work - As-built drawings required at project completion - Quantities and Part Numbers: - Water leak repairs: 1 (base), additional as optional - Hydrant relocations: 2 (base), 1 (optional) - Leak repairs under pavement: 2 (base), 1 (optional) - Leak repair and water pipe replacement: 1 - Priority and reduction valve installations: 2 (base), 1 (optional) - Replacement of water pipe by Schedule 4 PVC: 100 linear feet (optional) - Product line item part number: 7540-01-152-8067 (for water leak repairs) - Unique/Notable Requirements: - Contractor must provide all labor, materials, equipment, and supervision - Work must comply with all applicable codes and standards - Coordination with Arizona 811 for underground utility location - Mandatory site visit prior to proposal submission - Base period of performance is 60 days from Notice to Proceed, with optional line items for future repairs within a one-year contract period - No specific OEMs or proprietary products are named; standard waterworks materials and valves are expected.

Description

The Tonto National Forest - Tonto Basin Ranger District - plans to repair leaks in its drinking water network. The main objective of the project is to eliminate the known leaks and reduce potential for future leaks. At the end of the project, the contractor shall provide as-built drawings of the project to the Forest Service.

Leaks were noticed on the secondary pipes that feed 1- or 2-inch recreation hydrants. The Forest Service plans to relocate the hydrants to the main lines, abandoning the leaking pipes in place. One known leak to be repaired may be under the asphalt of the campground loop. After backfilling the trench, the contractor must place new asphalt over the cut portion and make necessary adjustments to return the loop to its original shape.

The contractor shall install one priority valve and two pressure reduction valves at the locations indicated by the Contracting Officer's Representative (COR). These values are critical in reducing and addressing potential leaks in the future.

The contractor shall provide all personnel, equipment, tools, and materials to accomplish the project. The contractor is responsible for the supervision, incidentals, and services required to perform the work in strict accordance with the applicable codes and requirements and the contract document.