Opportunity
SAM #36C26026Q0706
Annual Diesel Generator Testing Services for White City VA Medical Center
Buyer
Vanco 20
Posted
August 06, 2026
Respond By
August 20, 2026
Identifier
36C26026Q0706
NAICS
811310, 811219
The Department of Veterans Affairs, Network Contracting Office 20, is seeking a contractor to provide annual testing and exercise services for four diesel-powered Emergency Power Supply (EPS) generator installations at the White City VA Southern Oregon Rehabilitation Center and Clinics (VA SORCC) in Oregon. - Government Buyer: - Department of Veterans Affairs, Network Contracting Office 20, White City VA Medical Center - Scope of Work: - Annual testing (exercise) services for four diesel-powered EPS generator installations - Testing must comply with NFPA 110 standards, specifically: - Exercise generators at not less than 50% of nameplate kW rating for 30 minutes - Exercise at not less than 75% of nameplate kW rating for 1 hour - Total exercise duration of at least 1.5 continuous hours - Contract Structure: - One-year base period with four one-year option periods (total potential duration: 5 years) - Set-Aside: - Opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) - OEMs and Vendors: - No specific generator OEMs or models are mentioned in the solicitation - Unique/Notable Requirements: - Strict adherence to NFPA 110 standards for generator testing - Services must be performed on-site at the White City VA SORCC - Contractor must be able to test and exercise all four generators as specified
Description
This is a request for a 1-year base and 4 1-year options contract for Generator maintenance at the White City VAMC.
Contractor shall provide White City, Oregon, VA Southern Oregon Rehabilitation Center and Clinics (VA SORCC) with testing, (exercise) services for FOUR Diesel powered EPS installations. These subject items need to be tested, (exercised) in accordance with NFPA 110. Reference NFPA 110 section 8.4.2.3: Items shall be exercised with supplemental loads at not less than 50 percent of the EPS nameplate kW rating for 30 continuous minutes and at not less than 75 percent of the EPS nameplate kW rating for 1 continuous hour for a total test duration of not less than 1.5 continuous hours.