Opportunity
Renewable Water Resources Planetbids #597
Lower Reedy Streambank Stabilization Project Solicitation
Posted
August 05, 2026
Respond By
September 01, 2026
Identifier
597
NAICS
237990, 237110
This opportunity is a solicitation from Renewable Water Resources (ReWa) for the Lower Reedy WWRF Streambank Stabilization project in Greenville, SC. - Government Buyer: - Renewable Water Resources (ReWa), Purchasing Office - Scope of Work: - Restoration and stabilization of an eroded streambank section along the Reedy River, adjacent to sanitary sewer infrastructure - Removal of existing structures and debris - Installation of approximately 194 linear feet of boulder toe wall - Installation of two in-stream boulder vanes - Grading and restoration of washed-out bank - Implementation of sediment and erosion control measures - Revegetation of disturbed areas and newly constructed slopes for final stabilization - Products/Services Requested: - Boulder toe wall (194 linear feet) - In-stream boulder vanes (2 units) - Coir matting (563 square yards) - Permanent seeding, fertilizing, and mulching - Riparian seed mix and mulching - Streambank restoration and stabilization services - Demolition services - Construction management services - Unique/Notable Requirements: - Preference for domestic construction materials - Compliance with South Carolina Illegal Immigration Reform Act - Adherence to State Revolving Fund requirements if applicable - Bid, payment, and performance bonds required - Electronic bid submission - Lump sum bid; all work per contract documents and specifications - No specific OEMs are named in the solicitation.
Description
The solicitation is for the Lower Reedy WWRF Streambank Stabilization project, which involves restoration and stabilization of an eroded section of streambank along the Reedy River adjacent to existing sanitary sewer infrastructure. The work includes removal of existing structures and debris, installation of approximately 194 linear feet of boulder toe wall and two in-stream boulder vanes, grading and restoration of the washed-out bank, and implementation of sediment and erosion control measures. Disturbed areas and newly constructed slopes will be revegetated to provide final stabilization and reduce future erosion potential. The project requires compliance with bond requirements and includes a pre-bid meeting and electronic bid submission.