Opportunity

Maury County Civicplus #432

Construction and Outfitting of Pottsville Fire Station No. 27 for Maury County Fire Department

Posted

August 06, 2026

Respond By

September 30, 2026

Identifier

432

NAICS

236220

Maury County Fire Department is seeking bids for the construction of Pottsville Fire Station No. 27 in Columbia, TN. - Government Buyer: - Maury County Fire Department (MCFD), Maury County, TN - Project Scope: - Construction of a 10,434 SF fire and EMS station with a 6,476 SF apparatus bay - Includes site preparation, foundation, slab-on-grade, utilities, and full building construction - Architectural, structural, mechanical, electrical, plumbing, and fire protection systems - Compliance with 2021 IBC, ADA, and all federal, state, and local codes - OEMs and Key Equipment: - Whirlpool: appliances (refrigerators, range, microwave, washer, dryer, dishwasher, undercounter refrigerator, ice maker) - Intellihot: water heaters (i200) - Bell and Gossett: recirculating pump (ECO CIRC 20-18) - J R Smith: lint interceptor (8910-20) - Aurora: fire pump (Inline 4-383-7C), jockey pump (PVM1-5) - Bobrick: restroom accessories (paper towel dispensers, waste receptacles, toilet tissue dispensers, grab bars, soap dispensers) - Bradley: folding shower seat (9591) - Products/Quantities (selected): - 4 Whirlpool refrigerators (WRS315SDHM) - 1 Whirlpool range (WFE510S0HS) - 1 Intellihot water heater (i200), 3 units - 1 Aurora fire pump (Inline 4-383-7C) - 4 Bobrick paper towel dispensers (B-359) - Notable Requirements: - Strict adherence to geotechnical recommendations and site-specific utility coordination - All construction and installations must meet accessibility and code requirements - Warranty period of one year from acceptance - Substantial completion defined by Certificate of Use and Occupancy

Description

This solicitation is for the construction of the Maury County Fire Department's Pottsville Fire Station No. 27 located in Columbia, Tennessee. The project includes site preparation, foundation work, slab-on-grade construction, and utility services setup. The geotechnical engineering report provides detailed recommendations for soil conditions, slope inclinations, fill material criteria, and construction considerations. Bidders are required to review the geotechnical study and site plans prior to construction and coordinate with relevant agencies for permits and utility locations.

View original listing