Opportunity
Saskatchewan Tenders #PCS25020
Buffalo Pound Provincial Park Watermain Replacement Project Solicitation
Posted
July 28, 2026
Respond By
August 18, 2026
Identifier
PCS25020
NAICS
237110
This opportunity is for the replacement of the water main at Buffalo Pound Provincial Park, managed by the Government of Saskatchewan through SaskBuilds and Procurement. - Government Buyer: - Government of Saskatchewan - SaskBuilds and Procurement - Scope of Work: - Supply and installation of approximately 7.5 km of 200 mm diameter DR11 HDPE potable water main - Installation method: Horizontal Directional Drilling (HDD) - Replacement of existing asbestos cement water main - Includes all associated appurtenances: - Isolation valves - Air release and combination air valve chambers - Pressure reducing valve chambers - Drains, fittings, joint restraints - Water service connections - Additional requirements: - Site preparation, excavation, shoring, backfilling, and restoration - Utility locating - Connection to existing water distribution system - Hydrostatic pressure and leakage testing - Disinfection, flushing, and commissioning - Site cleanup and warranty corrections - No specific OEMs, brands, or part numbers are specified in the solicitation - The project requires comprehensive construction and utility installation services, with a focus on potable water infrastructure replacement
Description
The project involves the supply and installation of approximately 7.5 km of 200 mm diameter DR11 HDPE potable water main using Horizontal Directional Drilling (HDD) to replace the existing asbestos cement water main. The work includes all associated appurtenances such as isolation valves, air release and combination air valve chambers, pressure reducing valve chambers, drains, fittings, joint restraints, and water service connections. Site preparation activities, excavation, shoring, backfilling, restoration, utility locating, and connection to the existing water distribution system at the Buffalo Pound Water Treatment Plant are also included. Additionally, hydrostatic pressure and leakage testing, disinfection, flushing, commissioning, site cleanup, restoration, and warranty corrections are required. All work must be completed by March 24, 2027.