Opportunity

SAM #030ADV26R0048

Coolidge Auditorium Rigging Control System Modernization and Warranty

Buyer

Library of Congress Contracts Services

Posted

August 06, 2026

Respond By

August 26, 2026

Identifier

030ADV26R0048

NAICS

238290, 334310, 238210

The Library of Congress is seeking a contractor to modernize the theatrical rigging control system in the historic Coolidge Auditorium. - Government Buyer: - Library of Congress, Contracts and Grants Directorate, Library Contracting Officer - OEMs Mentioned: - Wenger - JR Clancy - Scope of Work: - Remove the existing Wenger/JR Clancy rigging control system, originally installed in the 1990s - Install a new, unified theatrical rigging control system integrating all existing motorized scenic and rigging subsystems - Replace the inoperable central control unit - Provide a one-year warranty with preventative maintenance, remote troubleshooting, and in-person support - Requirements & Constraints: - All work must comply with historic preservation standards and operational safety requirements - Installation must account for structural limitations and restricted practices typical of protected performance venues - No specific part numbers or quantities for equipment are provided in the solicitation - The contract is firm-fixed price, with a base period for installation and an option for a one-year warranty

Description

The Library of Congress (Library) requires contract support to modernize the theatrical rigging control systems for the historic Coolidge Auditorium.  The 485-seat venue opened in the 1920’s, designed with acoustic properties to support chamber music.  The venue began to support other types of performances, in addition to other types of events.  To support increased use, modernization was performed in the mid-1990’s which added motorized theatrical rigging and automation.  The legacy infrastructure and system added in the 1990’s was installed by Wenger/JR Clancy, and is characterized by distributed control points, variable motor behavior, and limited system intelligence.  The control unit for the system has been inoperable for over a year.  The installed infrastructure reflects a rigging ecosystem in which motorized scenic elements were deployed as semi-independent subsystems with limited interoperability and with centralized control unit.   At present, these subsystems can only be operated using standalone manual override stations, which are still operable for each component.  This modernization effort is intended to unify these systems into a single theater rigging control environment and replace the non-working control unit.  All work shall comply with historic preservation constraints, structural limitations, and restricted installation practices typical of protected performance venues.

The Contractor shall remove the current theatrical rigging control system and provide a new theatrical rigging control system for the Library’s Coolidge Auditorium.

View original listing