Opportunity
CanadaBuys #21422-27-5464975
Watermain Replacement and Reconnection at Beaver Creek Medium Institution for Correctional Service Canada
Posted
August 04, 2026
Respond By
August 20, 2026
Identifier
21422-27-5464975
NAICS
237110, 238990
Correctional Service Canada (CSC) is seeking a qualified contractor to replace and reconnect a 200 mm watermain at Beaver Creek Medium Institution, aiming to restore a looped water distribution system and address water hammer issues. - Government Buyer: - Correctional Service Canada (CSC), Contracting and Materiel Services - Contact: Elizabeth Lake - OEMs and Vendors: - No specific Original Equipment Manufacturers (OEMs) or vendors are named in the solicitation - Products/Services Requested: - Supply and installation of approximately 60 meters of new 200 mm (8-inch) watermain, including all necessary fittings, couplings, restraints, thrust restraint systems, bedding materials, and accessories - Demolition of existing concrete pad and removal of damaged watermain - Excavation, trenching, backfilling, and site restoration - Tie-in, disinfection, pressure and leakage testing, and commissioning of the new watermain - Provision of all labor, materials, equipment, supervision, permits, testing, and incidentals - Unique or Notable Requirements: - Mandatory site visit for bidders - Bidders must demonstrate experience with at least three similar watermain projects in the last five years - Contractor must verify all existing site conditions prior to construction - Deliverables include test results and as-built drawings - Open only to Canadian suppliers under the Policy on Reciprocal Procurement and the Canadian Free Trade Agreement (CFTA) - No security clearance or Indigenous set-asides required - Contract duration is 2 months, with work to be completed between contract award and November 13, 2026
Description
The Correctional Service Canada requires an experienced contractor to replace an isolated and deteriorated section of watermain and re-establish a continuous looped water distribution system at Beaver Creek Medium Institution. The work aims to restore normal system flow, eliminate dead-end conditions, and reduce water hammer issues within the existing water distribution network. The contractor must complete demolition, excavation, trenching, removal of damaged watermain, backfilling, restoration, supply, installation, tie-in, disinfection, testing, and commissioning of the new watermain. The contract duration is approximately 2 months starting from September 1, 2026.