Opportunity

PIEE #W912DR26BA011

Port of Baltimore Maintenance Dredging Services Solicitation

Buyer

USACE W2SD Endist Baltimore

Posted

July 16, 2026

Respond By

August 25, 2026

Identifier

W912DR26BA011

NAICS

237990

This opportunity is for maintenance dredging services in the Chesapeake Bay, supporting the Port of Baltimore: - Government buyer: U.S. Army Corps of Engineers, Baltimore District (W2SD ENDIST BALTIMORE) - Scope: Maintenance dredging of approximately 2,250,000 cubic yards from deep-draft federal navigation channels - Dredging to a depth of 50 feet mean lower low water, with 1–2 feet allowable overdepth - 1,538,000 cubic yards from Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, Upper Range Channels) to be placed at Poplar Island - 700,000 cubic yards from Baltimore Harbor Channels (Brewerton Angle, Curtis Bay Channels) to be placed at Cox Creek Dredged Material Containment Facility - Required equipment: - Large clamshell dredges - Hydraulic unloaders - Tugs - Material scows - Attendant plant and pipeline - No specific OEMs or vendors are named in the solicitation - Unique requirements: - Material Safety Data Sheet (MSDS) must be included with offer submissions - Strict placement locations for dredged material - Work must be completed within a defined seasonal window

Description

The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027. The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 – 2 foot of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 – 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 – 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.

View original listing