Opportunity
Orlando Opengov #281784
Orlando Seeks NFL-Compliant Synthetic Turf Replacement for Camping World Stadium
Posted
July 09, 2026
Respond By
August 10, 2026
Identifier
281784
NAICS
238990
The City of Orlando, through its Orlando Venues division, is seeking proposals for the replacement of the playing field at Camping World Stadium. - Project Scope: - Removal of the existing AstroTurf Rootzone 3D3 Blend TRIONIC HD 52 synthetic turf system - Installation of a new synthetic turf surface that strictly complies with the latest NFL and NFLPA Joint Surface Safety and Performance Committee standards - The new turf must support multi-event use (NFL, NCAA football, international soccer, concerts) and provide optimal comfort, cooling, and performance - System must deliver an 8-year lifespan and be suitable for the Jacksonville Jaguars’ one-season residency during stadium renovations - Technical Requirements: - Turf system must be installed over a base consisting of a two-layer crushed stone with a triaxial grid for impact mitigation - Infill materials (e.g., silica sand, Brockfill) must meet environmental and performance standards - Advanced waste management, PFAS and heavy metal testing, and minimization of microplastics are required - Ongoing testing and compliance with Florida law - OEMs and Vendors: - AstroTurf (current surface) - Brock (current pad and infill) - Other synthetic turf manufacturers may propose compliant systems - Notable Requirements: - Surface removal, base assessment, installation standards, and ongoing testing - Compliance with NFL/NFLPA standards and environmental health and safety regulations - Project aligns with a $400 million stadium renovation and the Jaguars’ temporary tenancy
Description
The City of Orlando is soliciting proposals for the replacement of the playing field at Camping World Stadium. The project involves installing a cost-effective synthetic turf surface that meets NFL and NFLPA standards, ensuring an 8-year lifespan with optimal comfort, cooling, and performance. The stadium currently uses AstroTurf Rootzone 3D3 Blend TRIONIC HD 52 and is undergoing a $400 million renovation scheduled for completion in 2027. The solicitation includes surface removal, base assessment, installation standards, and ongoing testing, with a mandatory pre-proposal conference and specific submission deadlines.